C.T. Brayton & Sons, Inc

is seeking certified and qualified DVBE subcontractors and/or suppliers to provide DIVISION 2 - SITEWORK 02070 Demolition 02110 Site Clearing 02200 Earthwork 02511 Hot-Mix Asphalt Paving 02515 Concrete 02760 Paving Marking Paint 02775 Detectable Tactile Warning Surfaces 02830 Steel Ornamental Fence System 02841 Parking Appurtenances DIVISION 7 - THERMAL AND MOISTURE PROTECTION 07920 Sealants and Caulking DIVISION 16 - ELECTRICAL 16000 Electrical General Requirements 16110 Raceways and Fittings 16300 Electrical Distribution System


PROJECT NAME:

Ripon Elementary School: Staff Parking Lot

BID CONTRACT #:

Not Available

AWARDING AGENCY:

Ripon Unified School District

PROJECT LOCATION:

509 West Main Street, Ripon, CA 95366, Ripon, CA, 95366

BID DUE DATE:

09-30-2026 at 03:00 PM

OUTREACH COORDINATOR:

Harlee Levin

TELEPHONE:

209-838-7388

FAX:

209-838-3960

ADDRESS:

1804 Jackson Ave, Escalon, CA, 95320

PROJECT DETAILS:

Date: September 11, 2026 

 

Bid Date: Wednesday, September 30, 2026 @ 3PM


Project: Ripon Elementary School: Staff Parking Lot
Location: 509 West Main Street, Ripon, CA 95366


Estimator: James Hill Project Coordinator: Harlee Levin
Email Bids To: estimator@ctbrayton.com Phone: 209-838-7388 Fax: 209-838-3960


PROJECT DESCRIPTION:
The scope of work for this project includes but is not limited to: Replacement of turf area with asphalt parking lot and concrete flatwork, Revised drainage and grading, New lighting, EVCS, and associated electrical infrastructure, New and reworked landscape areas and New fence sections and gates.


Pre-bid Job walk: Wednesday, 09/23/26 at 3PM


Location: 509 West Main Street, Ripon, CA 95366: Meet at flagpole.


Plans and Specs can be reviewed at the local Builders Exchanges or on our Website at www.ctbrayton.com under “Bidding”.


THIS IS NOT A LEASE LEASE-BACK CONTRACT. APPRENTICEABLE JOURNEYMAN ARE NOT REQUIRED.


If this Project includes work that will be performed by mechanical, electrical or plumbing (“MEP”) subcontractors
(contractors that hold C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43 or C-46 licenses), such MEP subcontractors must also be prequalified.


Please submit all bid proposals, questions and RFI’s to estimator@ctbrayton.com


Bid proposals emailed elsewhere may not be received in time to be considered.


PLEASE INCLUDE YOUR DIR REGISTRATION NUMBER WHEN SUBMITTING BID.


This project is considered public works under California Labor Code Section 1720. It requires payment of prevailing wages. Wage rates can be obtained from the CA Dept of Industrial Relations at
https://www.dir.ca.gov/OPRL/DPreWageDetermination.htm. All contractors bidding on this project must be registered with the DIR pursuant to Labor Code section 1725.5.


In accordance with the provision of California Public Contract Code §3300, the District requires that Bidders possess the appropriate classification(s) of California Contractors License at the time that the Contract for the Work is awarded. Such License must be maintained and kept current during the duration of the project.


All work performed on this project which falls under the recognized jurisdiction of the Carpenter’s Master Agreement for Northern California shall be performed by Union Carpenters.


This project is Prevailing Wage. Seeking DVBE Subcontractor/Supplier Participation.


All subcontractors must be bondable.
Premiums will be paid by C.T. Brayton & Sons, Inc.
EQUAL OPPORTUNITY EMPLOYER

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News Rss Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.