is seeking certified and qualified DVBE and SBE subcontractors and/or suppliers to provide lead compliance plan, construction area signs, traffic control systems, traffic control, flashing arrow sign, type III barricade, channelizer, portable flashing beacons, temporary barriers, temporary pedestrian route, portable changeable message sign, temporary crash cushion, job site management, water pollution control program, temporary drainage inlet protection, temporary concrete washout, roadway excavation, class 2 aggerate, minor hot mix asphalt, structural concrete, drainage inlet, reinforced concrete pipe, remove pipe, adjust frame and cover to grade, minor concrete, curb, gutter, sidewalk, curb ramp, detectable warning surface, iron, steal, remove concrete, demo, paint curb, remove roadway signs, furnish single sheet aluminum sign, road side sign, install sign, strap and saddle bracket, install roadside sign panel on existing post, paint traffic stripe, thermoplastic paint, thermoplastic crosswalk and pavement markings, enhanced wet nigh visibility paint, remove thermoplastic paint, high pressure water blasting, remove pavement markings, paint traffic stripe, pedestrian Hybrid Beacon Systems, concrete suppler, electrical supplier, asphalt grinding, asphalt supplier, demo, trucking
Construction on State Hwy at Lone Pine at East Muir Street
09-390204
State of California Department of Transportation District 9
395 South Lone Pine and Muir Street, Lone Pine, CA, 93545
05-28-2025 at 02:00 PM
Jason Plank
661-399-3759
661-399-3812
34762 Lencioni Avenue , Bakersfield, CA, 93308
PROJECT DETAILS:
34762 LENCIONI AVENUE
BAKERSFIELD, CA 93308
OFFICE: (661) 399-3759
FAX: (661) 399-3812
Cen-Cal Construction is actively soliciting bids from prospective subcontractors or material suppliers whose businesses are California State Certified DVBE and SBE Contractors or Suppliers. Bids from prospective subcontractors or material suppliers are sought in connection with the Project Named:
Construction on State Highway in Inyo County at Lone Pine at East Muir Street.
To be located in Inyo County and funded in whole or part by public funds.
Bid Date: May 28, 2025 @ 2:00 PM
Interested certified firms may contact Jason Plank @ (661) 399-3759 or by email at cencalconstruction@ymail.com until 5:00 PM on May 27, 2025.
** 5/27/2025 5PM Due Date for Bids Strictly Enforced to Ensure Time to Finish Bid Paperwork on Day of Bid**
Bid documents and addendums can be obtained from:
Kern County Builders Exchange https://www.kcbex.com/ or The Department of Transportation https://dot.ca.gov/
*Prospective bidders are encouraged to view the project site and required to perform their own due diligence prior to submitting a bid. *
We are an equal opportunity employer and will consider all bids submitted. Subcontractors are required to hold a valid contractors license as well as current Liability, Commercial Auto & Workers Compensation Insurance with applicable limits to meet the contract documents for said project. We encourage DVBE and SBE certified firms to contact Cen-Cal Construction to learn what assistance we can provide to you such as: lines of credit, insurance, bonds, equipment, supplies, materials, discounts, plans and specifications, technical assistance and services, and other related services. Subcontractor and Trucking quotes/bids must be valid at minimum for the entire duration of the project stated in the contract documents. Subcontractor and Supplier bids are required by 5:00 PM May 27, 2025.
Bids for the followings Items are being requested:
Item 1: Lead Compliance Plan
Item 2: Time-Related Overhead (WDAY)
Item 3: Construction Area Signs
Item 4: Traffic Control System
Item 5: Flashing Arrow Sign
Item 6: Type III Barricade
Item 7: Channelizer (Surface Mounted)
Item 8: Portable Flashing Beacons
Item 9: Temporary Barrier System
Item 10: Temporary Pedestrian Access Route
Item 11: Portable Changeable Message Sign (EA)
Item 12: Temporary Crash Cushion TL-2
Item 13: Job Site Management
Item 14: Water Pollution Control Program
Item 15: Temporary Drainage Inlet Protection
Item 16: Temporary Concrete Washout
Item 17: Roadway Excavation
Item 18: Class 2 Aggregate Base (TON)
Item 19: Minor Hot Mix Asphalt
Item 20: (F)-Structural Concrete, Drainage Inlet
Item 21: 24” Reinforced Concrete Pipe
Item 22: Remove Pipe
Item 23: Adjust Frame and Cover to Grade
Item 24: Minor Concrete (Curb) (CY)
Item 25: Detectable Warning Surface
Item 26: Minor Concrete (Sidewalk)
Item 27: Minor Concrete (Curb Ramp)
Item 28: Remove Concrete (Curb, Gutter, and Sidewalk) (CY)
Item 29: (F)-Miscellaneous Iron and Still
Item 30: Paint Curb (2-Coat)
Item 31: Remove Roadside Sign
Item 32: Furnish Single Sheet Aluminum Sign (0.063”-Unframed)
Item 33: Roadside Sign-One Post
Item 34: Install Sign (Strap and Saddle Bracket Method)
Item 35: Install Roadside Sign Panel on Existing Post
Item 36: Paint Traffic Stripe (2-Coat)
Item 37: Thermoplastic Crosswalk and Pavement Marking (Enhanced Wet Night Visibility)
Item 38: Remove Traffic Stripe (High Pressured Water Blasting)
Item 39: Remove Pavement Marking
Item 40: 6” Paint Traffic Stripe (2-Coat) (Broken 17-7)
Item 41: Pedestrian Hybrid Beacon Systems
** Also requesting All Supplier Quotes**
** All Items can be broken down by supplier and install**
PDF ATTACHMENTS: