Trade Journal

Granite Rock Company

is seeking certified and qualified DBE subcontractors and/or suppliers to provide All bid items are available particularly these: Construction Area Signs, Traffic Control / Traffic Control Supervisor Stationary Impact Attenuator Vehicle / Portable Radar Speed Feedback Sign System / PCMS / Temporary Crash Cushions, Striping – Temporary & Permanent, Temporary Barrier, Prepare SWPPP / Inspections / Reporting, Temporary Erosion Control – BFM, DI Protection, Fiber Rolls, Silt Fence, Permanent Erosion Control – Netting, Hydromulch, Fiber Rolls, Hydroseed, Compost, Incorporate Materials, Street Sweeping, Trucking, Tack Coat, Asphalt, Dike, Cold Plane – Asphalt Milling / Grinding, Diamond Grinding, Inertial Profiler, Joint Seal, Rapid Set Concrete Patch, Prepare Bridge Deck Surface, Polyester Concrete Overlay, Treat Bridge Deck, Bridge Removal, Storm Drain, Underground, Minor Concrete, Rebar – Reinforcing Steel, Utility Adjustments, Striping & Markers, Signs, Delineators, MBGR / End Anchors/ AITS / Crash Cushions, MBGR Removals, Concrete Barrier, Electrical – Maintain (E) TMS, Modify Signal & Lighting, Quality Control, and Noise Monitoring.


PROJECT NAME:

CONSTRUCTION ON STATE HIGHWAY IN SAN MATEO COUNTY IN AND NEAR HALF MOON BAY FROM WAVECREST ROAD TO 0.1 MILE SOUTH OF MARINE BOULEVARD Contract No. 04-0Q1304

BID CONTRACT #:

Contract No. 04-0Q1304

AWARDING AGENCY:

Caltrans

PROJECT LOCATION:

Half Moon Bay, CA

BID DUE DATE:

05-28-2025 at 02:00 PM

OUTREACH COORDINATOR:

Eric Cushman

TELEPHONE:

408-574-1400

FAX:

408-365-9548

ADDRESS:

5225 Hellyer Avenue, Suite 220, San Jose, CA, 95138

PROJECT DETAILS:

Granite Rock Company ‘Graniterock’ is signatory to Operating Engineers, Laborers, Teamsters, Carpenters, and Cement Masons unions. Plans and Specifications are available in our Estimating Office located at 5225 Hellyer Avenue, Suite 220, San Jose, or electronically at Caltrans Office Engineer website http://ppmoe.dot.ca.gov/des/oe/weekly-ads/all-adv-projects.php. 100% payment and 100% performance bonds in the amount of the subcontractor’s bid will be required from a qualified surety company. Subcontractors must possess a current contractor’s license, DIR number, insurance and worker’s compensation coverage. Bonding assistance is available. Graniterock will pay bond premium up to 1.5%. In addition to bonding assistance, 
subcontractors are encouraged to contact Graniterock Estimating with questions regarding obtaining lines of credit, insurance, equipment, materials and/or supplies, or with any questions you may have. Subcontractors will be required to enter into our standard contract. DBE Subcontractors must be listed by the CUCP for the work code(s) that apply to the scope of work they are quoting. Graniterock will break down items of work to facilitate DBE participation. Graniterock intends to work cooperatively with all qualified DBE firms seeking work on this project. Granite Rock Company is an Equal Opportunity Employer. 

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News YouTube Compliance News

Copyright © 2025 Compliance News All rights reserved.