Trade Journal

CORE Construction

is seeking certified and qualified DVBE subcontractors and/or suppliers to provide • Bid Package #007 Survey & Staking • Bid Package #008 Site Demolition, Earthwork, Paving & Striping • Site Utilities #009 Site Utilities • Bid Package #012 SWPPP • Bid Package #016 Landscape & Irrigation • Bid Package #020 Shade Structure • Bid Package #023 Fencing & Gates • Bid Package #024 Site Work Concrete • Bid Package #030 Structural Concrete • Bid Package #031 Masonry • Bid Package #033 Structural Steel • Bid Package #034 Metal Decking • Bid Package #035 Misc. Metals • Bid Package #040 Caulking & Sealants • Bid Package #044 Acoustic & Thermal Insulation • Bid Package #046 Membrane Roofing • Bid Package #050 Fiber Cement Siding • Bid Package #051 Cement Plaster • Bid Package #052 Glass & Glazing • Bid Package #054 Special Doors • Bid Package #056 Door, Frames & Hardware • Bid Package #059 Casework & Finish Carpentry • Bid Package #060 Drywall & Framing • Bid Package #061 Painting • Bid Package #062 Acoustical Ceiling & Wall Treatments • Bid Package #064 Tile • Bid Package #065 Carpet & Resilient Flooring • Bid Package #066 Fluid Applied Flooring • Bid Package #070 Final Clean • Bid Package #072 Building Signage • Bid Package #074 Bathroom Accessories • Bid Package #075 Building Specialties • Bid Package #076 FRL/FRP • Bid Package #082 Window Covering • Bid Package #085 Food Service Equipment • Bid Package #097 Fire Suppression • Bid Package #098 Plumbing • Bid Package #100 HVAC & Mechanical • Bid Package #102 Testing & Balancing • Bid Package #103 Electrical & Low Voltage System


PROJECT NAME:

PLESD- Plumas Lake Middle School Increment 1

BID CONTRACT #:

Not Available

AWARDING AGENCY:

CORE Construction

PROJECT LOCATION:

River Oaks Blvd., Plumas Lake, CA, 95961

BID DUE DATE:

05-29-2025 at 02:00 PM

OUTREACH COORDINATOR:

Cristian Rivera

TELEPHONE:

530-883-8250

FAX:

Not Available

ADDRESS:

1410 Rocky Ridge Dr Suit 180, Roseville, CA, 95661

PROJECT DETAILS:

Request for Proposals

 

CORE Construction along with Plumas Lake Elementary School District requests proposals from licensed subcontractors for the following Lease-Leaseback project:

 

Plumas Lake Elementary School District

Plumas Lake Middle School Increment 1

River Oaks Blvd, 

Plumas Lake, CA 95961

 

DSA Application # 02-122946

 

Scheduled bidding period 4/28/2025 – 5/29/2025

The project involves the construction of a new middle school campus, which will include an administration building, a multi-purpose building, and four modular classroom buildings (Provided by others). The scope also encompasses all associated site improvements. Site work will include landscaping, hardscaping, fencing, on-site parking, and the installation of shade structures. Additionally, the project includes the installation of all necessary utilities, such as sewer, water, fire protection, electrical, and gas systems.

 

Pursuant to Public Contract Code section 20111.6*, each prospective MEP Contractor holding C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43, and/or C-46 licenses must be prequalified with Plumas Lake Elementary school District 

 

To become prequalified with CORE Construction, or to update your current qualifications, please fill out the online application request by visiting: https://www.coreconstruction.com/subcontractors/ then select “California”.

 

For project questions, please email brianbledsoe@coreconstruction.com

For prequalification questions, please email leviahner@coreconstruction.com

 

Prevailing Wage rate laws apply | 3% DVBE goal 

Skilled and Trained Requirements Apply

PLESD & CORE Construction are equal opportunity employers.

 

 

 

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News YouTube Compliance News

Copyright © 2025 Compliance News All rights reserved.