is seeking certified and qualified DVBE subcontractors and/or suppliers to provide BID PACKAGE #04 – DEMOLITION, CONCRETE, CONCRETE FLOOR FINISHES, STRUCTURAL STEEL FRAMING, STEEL DECKING, METAL FABRICATIONS, PIPE & TUBE RAILINGS, ROUGH CARPENTRY, SHEET WATERPROOFING, DOOR HARDWARE, ALUMINUM-FRAMED STOREFRONTS, GLAZING, TILING, RESILIENT FLOORING, RESILIENT ATHLETIC FLOORING, EXTERIOR PAINTING, INTERIOR PAINTING, HIGH PERFORMANCE COATINGS, GRAFFITI-RESISTANT COATINGS, VISUAL DISPLAY BOARDS, SIGNAGE, WALL AND DOOR PROTECTION, TOILET ACCESSORIES, GYMNASIUM EQUIPMENT, MURAL PAINTING AND FAUX FINISHES, SITE CLEARING, GRADING, EXCAVATION, TRENCHING, FILL, AGGREGATE BASE COURSES, ASPHALT PAVING, PRECAST CONCRETE UNIT PAVING, CONCRETE WHEEL STOPS, PAINTED MARKINGS, DECORATIVE METAL FENCES AND GATES, LANDSCAPING, IRRIGATION, FINAL CLEANING, SURVEYING, SWPPPs/BMPs, TEMPORARY SERVICES
Shadow Hills High School – Phase 2 Wrestling Room Building
390/02F
Desert Sands Unified School District
39-225 Jefferson St, Indio, CA, 92203
04-24-2025 at 02:00 PM
Monica James
(657) 231-6230
(657) 231-6646
1571 Parkway Loop, Suite B , Tustin, CA, 92780
PROJECT DETAILS:
PLANS & SPECS AVAILABLE THROUGH DROPBOX LINK BELOW:
When inquiring about this bid please also include the following email on correspondence:
Estimating@RVHConstructors.com