is seeking certified and qualified DBE subcontractors and/or suppliers to provide is seeking certified and qualified DVBE subcontractors and/or suppliers to provide is seeking certified and qualified City of Oakland SLBE and SELBE subcontractors and/or suppliers to provide concrete, steel, metal decking, carpentry, waterproofing, insulation, metal panels, roofing, joint sealants, doors frames hardware, windows, drywall, acoustical ceiling, plaster, painting, signage, toilet accessories, metal shelving, elevators, mechanical, plumbing, electrical, utilities, earthwork, landscape, ground improvements
Water Pollution Control Facility (WPCF) – Administration Building
612‐07786
City of Hayward
3400 Enterprise Ave, Hayward, CA, 94531
02-11-2025 at 01:00 PM
Tammy Enos
(925) 775-4227
(925) 238-0428
103 Technology Court, Suite A, Brentwood, CA, 94513
PROJECT DETAILS:
We are accepting proposals from all trades/suppliers for work associated with Divisions 02 thru 33. Project consists of: Construction, startup, and commissioning of the WPCF Administration Building, including all engineering, labor, materials, and equipment as required by the Contract Documents, including but not limited to selective demolition and salvaging of existing facilities and systems; site paving and grading; landscaping and other site improvements; yard piping and electrical systems; structural and architectural work; plumbing and heating, ventilation, and air conditioning systems; laboratory; fire alarm and suppression systems; power supply systems; instrumentation and control systems; and all other items necessary for a complete and functional facility
We are an Equal Opportunity Employer. If you are planning to bid this project, we encourage your participation and welcome your bid. All qualified bidders will receive consideration without regard to race, color, religion, sex or national origin. Plans & specs available:
Subcontractors will be required to enter into our standard contract. No modifications to the contract are permitted. All subcontractors/vendors awarded work on this project must be able to furnish subcontract performance and payment bonds, for the amount of the subcontract bid, issued by an admitted corporate surety acceptable to our company.
We are accepting sub/supplier pricing from all divisions 2 thru 33 listed in the contract specifications.