is seeking certified and qualified DVBE subcontractors and/or suppliers to provide grading, paving, utilities, site concrete, fencing, drywall, painting, acoustic ceilings, flooring, HVAC plumbing, electrical, plaster, metal roofing, metal siding, signage, ceramic tile, wall coverings, toilet accessories, casework
New Wellness Center Building at Rancho San Juan High School
Not Available
Salinas Union High School District
1100 Rogge Road, Salinas, CA, 93906
01-07-2025 at 02:00 PM
Kyle Chamberlain
707-527-5788
Not Available
70 Stony Point Road, Suite D, Santa Rosa, CA, 95401
PROJECT DETAILS:
REQUEST FOR BIDS TO PERFORM SUBCONTRACTOR CONSTRUCTION SERVICES
JL Construction, Inc. is requesting subcontractor bids for the NEW WELLNESS CENTER BUILDING AT RANCHO SAN JUAN HIGH SCHOOL, a lease-lease back project, which consists of the following:
Scope of work: Site work including but not limited to demolition, grading, paving, utilities, fencing, gates, site concrete, site electrical, fire alarm and low voltage systems to support new building. All trade for construction of new wellness center building.
Interested subcontractors shall submit bids on or before January 7, 2025 by 2:00 PM, to JL Construction, Inc., Attn: Kyle Chamberlain. Bids will be accepted via email at kylec@jlcbuild.com. Each subcontractor is responsible to ensure that the bid is received by January 7, 2025 by 2:00 PM.
JL Construction, Inc. will award the subcontracts based on the best value criteria permitted under Education Code § 17406 and as authorized by the District’s governing board.
Each subcontractor’s license(s) must be active and in good standing at the time it provides its proposal and must remain so throughout the term of the Contract. Each subcontractor shall comply with the registration and qualification requirements pursuant to sections 1725.5 and 1771.1 of the California Labor Code and the skilled and trained workforce requirements pursuant to section 2600, et seq., of the California Public Contract Code.
Pursuant to Assembly Bill 566 all contractors must meet the apprenticeship requirements for Lease-Leaseback Projects. All contractors must be able to comply with the new apprenticeship requirements and will be required to submit monthly reporting of apprenticeship hours worked along with graduate records of staff.
All Mechanical, Electrical and Plumbing & Fire Sprinkler (MEPFS) subcontractors must be prequalified with the District no later than five (5) days before the bid submission deadline. To ensure prequalification, MEP subcontractors shall submit their prequalification packet no later than ten (10) days prior to the bid submission deadline. Prequalification applications are available at https://www.salinasuhsd.org/Departments/Business-Services/Planning-and-Facilities/For-Contractors/index.html
Contract Documents are available for review at JL Construction, Inc., 70 Stony Point Road, Suite D, Santa Rosa, CA 95401 or by requesting an electronic copy.
All questions should be directed to Kyle Chamberlain, kylec@jlcbuild.com
Last day for RFI’s is 1/3/25, end of day.