Cen-Cal Construction

is seeking certified and qualified DBE, MBE, SBE and WBE subcontractors and/or suppliers to provide lead compliance plan, traffic control, develop water supply, trench safety, SWPPP, Remove Concrete, clearing Grubbing, concrete, trucking, landscaping, class II base, paving, hot mix asphalt, drainage inlet, junction box, manhole, reinforced concrete pipe, relocate mailbox, relocate bollard, fence, gate, block wall, pedestrian barricade, thermoplastic pavement markings, striping, remove striping, mobilization


PROJECT NAME:

Pedestrian Path Improvements in Rexland Acres on Gary Place, Garden Drive and Price Street

BID CONTRACT #:

25019

AWARDING AGENCY:

Kern County Public Works Department

PROJECT LOCATION:

Gary Place, Garden Drive and Price Street, Bakersfield, CA, 93307

BID DUE DATE:

11-20-2024 at 11:00 AM

OUTREACH COORDINATOR:

Jason Plank

TELEPHONE:

661-399-3759

FAX:

661-399-3812

ADDRESS:

34762 Lencioni Avenue , Bakersfield, CA, 93308

PROJECT DETAILS:

Cen-Cal Construction is actively soliciting bids from prospective subcontractors or material suppliers whose businesses are California State Certified DBE/SBE/WBE/MBE Contractors or Suppliers.  Bids from prospective subcontractors or material suppliers are sought in connection with the Project Named:

Pedestrian Path Improvements in Rexland Acres on Gary Place, Garden Dr and Price Street

To be located in Kern County and funded in whole or part by federal funds.

Bid Date: November 20, 2024 @ 11:00 AM

Interested certified firms may contact Jason Plank @ (661) 399-3759 or by email at cencalconstruction@ymail.com until 5:00 PM on November 19, 2024.

** 11/19/2024- 5PM Due Date for Bids Strictly Enforced to Ensure Time to Finish Bid Paperwork on Day of Bid**

 

Bid documents and addendums can be obtained from:

https://kernpublicworks.com

 

*Prospective bidders are encouraged to view the project site and required to perform their own due diligence prior to submitting a bid. *

 

We are an equal opportunity employer and will consider all bids submitted. Subcontractors are required to hold a valid contractors license as well as current Liability, Commercial Auto & Workers Compensation Insurance with applicable limits to meet the contract documents for said project. We encourage DBE certified firms to contact Cen-Cal Construction to learn what assistance we can provide to you such as: lines of credit, insurance, bonds, equipment, supplies, materials, discounts, plans and specifications, technical assistance and services, and other related services. Subcontractor and Trucking quotes/bids must be valid at minimum for the entire duration of the project stated in the contract documents.   Subcontractor and Supplier bids are required by 5:00 PM November 19, 2024.

Bids for the followings Items are being requested:

 


 

Item 1-Lead Compliance Plan

Item 2- Trench Safety

Item 3-Develop Water Supply                                                             

Item 4- Temporary Traffic Control                                                       

Item 5- Prepare SWPPP

Item 6- Remove Concrete

Item 7- Clearing & Grubbing                                             

Item 8- Roadway Excavation 

Item 9- Repair Existing Landscaping                                                             

Item 10- Finishing Roadway                                               

Item 11- Class II Aggregate Base                                           

Item 12- Hot Mix Asphalt Type A

Item 13- Minor Structure (Drainage Inlet)

Item 14- Minor Structure (Junction Box)

Item 15- Minor Structure (Manhole)

Item 16- 18” Reinforced Concrete Pipe (Class III)

Item 17- Modify Junction Box

Item 18-25 Misc Minor Concrete

Item 26- Survey Monument Encasements                           

Item 27- Relocate Mailbox

Item 28- Relocate Bollard

Item 29- Reconstruct Wrought Iron Fence

Item 30- Reconstruct Block Wall

Item 31- Reconstruct Block Wall with Wrought Iron Fence

Item 32- Reconstruct Wood Fence

Item 33- Reconstruct Chain Link Fence

Item 34- Reset Gate

Item 35- Reset Rolling Gate to Grade

Item 36- Relocate Roadside Sign- One Post

Item 37- Remove Pedestrian Barricade

Item 38- Thermoplastic Pavement Marking

Item 39- Paint Traffic Stripe- 2 Coat

Item 40- Remove Painted Traffic Stripe

Item 41- Mobilization

 

** Also requesting Supplier Quotes**

**All Items can be broken down by supplier and install**


 

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News Rss Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.