is seeking certified and qualified DBE, MBE, SBE and WBE subcontractors and/or suppliers to provide lead compliance plan, develop water supply, traffic control, SWPPP, Remove Concrete, Clearing Grubbing, Roadway excavation, landscaping, class II Base, Paving, Hot Mix Asphalt, Concrete, Relocate Mailbox, under sidewalk drain, remove bollard, fence, gate, roadway sign, pedestrian barricade, thermoplastic pavement markings, striping, remove striping and markings, mobilization
Pedestrian Path Improvements on Various Streets in Ford City
25020
Kern County Public Works Department
Various Streets Ford City, Ford City, CA, 93268
11-20-2024 at 11:00 AM
Jason Plank
661-399-3759
661-399-3812
34762 Lencioni Avenue , Bakersfield, CA, 93308
PROJECT DETAILS:
Cen-Cal Construction is actively soliciting bids from prospective subcontractors or material suppliers whose businesses are California State Certified DBE/SBE/WBE/MBE Contractors or Suppliers. Bids from prospective subcontractors or material suppliers are sought in connection with the Project Named:
Pedestrian Path Improvements on Various Streets in Ford City
To be located in Kern County and funded in whole or part by federal funds.
Bid Date: November 20, 2024 @ 11:00 AM
Interested certified firms may contact Jason Plank @ (661) 399-3759 or by email at cencalconstruction@ymail.com until 5:00 PM on November 19, 2024.
** 11/19/2024- 5PM Due Date for Bids Strictly Enforced to Ensure Time to Finish Bid Paperwork on Day of Bid**
Bid documents and addendums can be obtained from:
https://kernpublicworks.com
*Prospective bidders are encouraged to view the project site and required to perform their own due diligence prior to submitting a bid. *
We are an equal opportunity employer and will consider all bids submitted. Subcontractors are required to hold a valid contractors license as well as current Liability, Commercial Auto & Workers Compensation Insurance with applicable limits to meet the contract documents for said project. We encourage DBE certified firms to contact Cen-Cal Construction to learn what assistance we can provide to you such as: lines of credit, insurance, bonds, equipment, supplies, materials, discounts, plans and specifications, technical assistance and services, and other related services. Subcontractor and Trucking quotes/bids must be valid at minimum for the entire duration of the project stated in the contract documents. Subcontractor and Supplier bids are required by 5:00 PM November 19, 2024.
Bids for the followings Items are being requested:
Item 1-Lead Compliance Plan
Item 2-Develop Water Supply
Item 3- Temporary Traffic Control
Item 4- Prepare SWPPP
Item 5- Remove Concrete
Item 6- Clearing & Grubbing
Item 7- Roadway Excavation
Item 8- Repair Existing Landscaping
Item 9- Finishing Roadway
Item 10- Class II Aggregate Base
Item 11- Hot Mix Asphalt Type A
Item 12- Type B1-6 Curb
Item 13- Cross Drain
Item 14- Curb & Gutter
Item 15- Type C Drive Approach
Item 16- Drive Approach
Item 17- Sidewalk
Item 18- Driveway, Walkway & Steps
Item 19- Curb Ramp
Item 20- Relocate Mailbox
Item 21- Under Sidewalk Drain
Item 22- Remove Bollard
Item 23- Reconstruct Fence
Item 24- Reset Gate
Item 25- Reset Rolling Gate to Grade
Item 26- Relocate Roadway Sign- One Post
Item 27- Relocate Pedestrian Barricade
Item 28- Thermoplastic Pavement markings
Item 29- Paint Traffic Stripe- 2 Coat
Item 30- Remove Traffic Stripe and Pavement Marking
Item 31- Mobilization
** Also requesting Supplier Quotes**
**All Items can be broken down by supplier and install**
PDF ATTACHMENTS: