Westrock General Engineering

is seeking certified and qualified DBE, MBE, SBE and WBE subcontractors and/or suppliers to provide lead compliance plan, develop water supply, traffic control, wpcp, remove concrete, clearing grubbing, Roadway excavation, finishing roadway, class II base, paving, cold plane asphalt concrete, reinforced concrete pipe, concrete, relocate mailbox, fence, roadside signs, handrailing, mobilization


PROJECT NAME:

Pedestrian Path Improvements on 20th Street West from Sonja Drive to Orange Street

BID CONTRACT #:

25014

AWARDING AGENCY:

Kern County Public Works Department

PROJECT LOCATION:

20th Street West, Rosamond, CA, 93560

BID DUE DATE:

11-20-2024 at 11:00 AM

OUTREACH COORDINATOR:

Joe Archuleta

TELEPHONE:

661-496-4265

FAX:

661-424-7815

ADDRESS:

PO Box 71377 , Bakersfield, CA, 99387

PROJECT DETAILS:

Westrock General Engineering is actively soliciting bids from prospective subcontractors or material suppliers whose businesses are California State Certified DBE/SBE/MBE/WBE Contractors or Suppliers.  Bids from prospective subcontractors or material suppliers are sought in connection with the Project Named:

Pedestrian Path Improvements on 20th Street West from Sonja Drive to Orange Street

To be located in Kern County and funded in whole or part by federal funds.

Bid Date: November 20, 2024 @ 11:00 AM

Interested certified firms may contact Joe Archuleta @ (661) 618-6906 or by email at jarchuleta@westrockgeneralengineering.com until 5:00 PM on November 19, 2024.

** 11/19/2024 5PM Due Date for Bids Strictly Enforced to Ensure Time to Finish Bid Paperwork on Day of Bid**

 

Bid documents and addendums can be obtained from:

https://kernpublicworks.com

 

*Prospective bidders are encouraged to view the project site and required to perform their own due diligence prior to submitting a bid. *

We are an equal opportunity employer and will consider all bids submitted. Subcontractors are required to hold a valid contractors license as well as current Liability, Commercial Auto & Workers Compensation Insurance with applicable limits to meet the contract documents for said project. We encourage DBE certified firms to contact Westrock General Engineering to learn what assistance we can provide to you such as: lines of credit, insurance, bonds, equipment, supplies, materials, discounts, plans and specifications, technical assistance and services, and other related services. Subcontractor and Trucking quotes/bids must be valid at minimum for the entire duration of the project stated in the contract documents.   Subcontractor and Supplier bids are required by 5:00 PM November 19, 2024.

 

Bids for the followings Items are being requested:

 


 

Item 1-Lead Compliance Plan

Item 2-Develop Water Supply                                                             

Item 3- Temporary Traffic Control                                                       

Item 4- Prepare WPCP

Item 5- Remove Concrete                                           

Item 6- Clearing & Grubbing 

Item 7- Roadway Excavation                                                               

Item 8- Finishing Roadway                                                             

Item 9- Class II Base                                   

Item 10- Hot Mix Asphalt Type A 

Item 11- Cold Plane Asphalt Concrete

Item 12- 18” Reinforced Concrete Pipe

Item 13- 24” Reinforced Concrete Pipe

Item 14- Curb & Gutter

Item 15- Drive Approach

Item 16- Type C Drive Approach

Item 17- Sidewalk

Item 18- Curb Ramp

Item 19- Relocate Mailbox

Item 20- Reconstruct Chain Link Fence                 

Item 21- Relocate Roadside Sign- One Post

Item 22- Handrailing

Item 23- Mobilization

 

 

** Also requesting Supplier Quotes**

**All Items can be broken down by supplier and install**


 

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News Rss Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.