is seeking certified and qualified DVBE subcontractors and/or suppliers to provide grading, paving, utilities, concrete, striping, signage, drywall, insulation, roofing, flooring, plaster, tile, acoustic ceilings, painting, plumbing, HVAC, electrical
Cesar Chavez Elementary New TK Kinder Building
Not Available
Alisal Union School District
1525 Towt Street, Salinas, CA, 93905
11-22-2024 at 03:00 PM
Kyle Chamberlain
707-527-5788
Not Available
70 Stony Point Road, Suite D, Santa Rosa, CA, 95401
PROJECT DETAILS:
REQUEST FOR BIDS TO PERFORM SUBCONTRACTOR CONSTRUCTION SERVICES
JL Construction, Inc. is requesting subcontractor bids for the CESAR CHAVEZ ELEMENTARY NEW TK KINDER BUILDING, a lease-lease back project, which consists of the following:
Scope of work:
Increment #1 – site work including demolition, grading, paving, utilities, fencing, gates, striping, site concrete, play structure, poured-in-place surfacing, synthetic turf, PC shade structure and site electrical to support new classroom building.
Increment #2 – construction of classroom building. Fire alarm and low voltage systems.
Interested subcontractors shall submit bids on or before November 22, 2024 by 3:00 PM, to JL Construction, Inc., Attn: Kyle Chamberlain. Bids will be accepted via email at kylec@jlcbuild.com. Each subcontractor is responsible to ensure that the bid is received by November 22, 2024 by 3:00 PM.
JL Construction, Inc. will award the subcontracts based on the best value criteria permitted under Education Code § 17406 and as authorized by the District’s governing board.
Each subcontractor’s license(s) must be active and in good standing at the time it provides its proposal and must remain so throughout the term of the Contract. Each subcontractor shall comply with the registration and qualification requirements pursuant to sections 1725.5 and 1771.1 of the California Labor Code and the skilled and trained workforce requirements pursuant to section 2600, et seq., of the California Public Contract Code.
Pursuant to Assembly Bill 566 all contractors must meet the apprenticeship requirements for Lease-Leaseback Projects. All contractors must be able to comply with the new apprenticeship requirements and will be required to submit monthly reporting of apprenticeship hours worked along with graduate records of staff.
All Mechanical, Electrical and Plumbing & Fire Sprinkler (MEPFS) subcontractors must be prequalified with the District no later than five (5) days before the bid submission deadline. To ensure prequalification, MEP subcontractors shall submit their prequalification packet no later than ten (10) days prior to the bid submission deadline. Prequalification applications are available at https://www.alisal.org/domain/197
Contract Documents are available for review at JL Construction, Inc., 70 Stony Point Road, Suite D, Santa Rosa, CA 95401 or by requesting an electronic copy.
All questions should be directed to Kyle Chamberlain, kylec@jlcbuild.com
Last day for RFI’s is 11/15/24, end of day.