is seeking certified and qualified DVBE subcontractors and/or suppliers to provide Demolition, Metal Fabrications, Pipe and Tube Railings, Insulation, Asphalt Shingles, Sheet Metal Flashing and Trim, Doors and Frames Installation, Vinyl Windows, Portland Cement Plaster, Gypsum Board, Ceramic Tile, Acoustical Panel Ceilings, Painting, Plumbing, HVAC, Electrical, Communications, Fire Alarm, and Asphalt Paving
Fairgrove Classroom Building
22-07
Lucia Mar Unified School District
2101 The Pike, Grover Beach, CA, 93433
04-21-2022 at 02:00 PM
Brad Edwards
Not Available
805-614-9909
PO Box 350, Nipomo, CA, 93444
PROJECT DETAILS:
Scope:
New stick built six classroom building, set two relocatable classrooms, new electrical service. All work to be completed to industry standards and best practices. Further details available in specs.
Plans are available electronically from be@edwardscongroup.com. All bids and material quotes must be per plans and specifications. All bids are required to be received in our office through our e-mail or fax number at least 1-2 business days before Bid Due Date so that we have ample time to fill out the required bid forms for the owner. Edwards Construction Group, Inc. is an Equal Opportunity Employer. Bonds may be required and subcontractor must agree to our subcontract agreement.