Edwards Construction Group

is seeking certified and qualified DVBE subcontractors and/or suppliers to provide Demolition, Metal Fabrications, Pipe and Tube Railings, Insulation, Asphalt Shingles, Sheet Metal Flashing and Trim, Doors and Frames Installation, Vinyl Windows, Portland Cement Plaster, Gypsum Board, Ceramic Tile, Acoustical Panel Ceilings, Painting, Plumbing, HVAC, Electrical, Communications, Fire Alarm, and Asphalt Paving


PROJECT NAME:

Fairgrove Classroom Building

BID CONTRACT #:

22-07

AWARDING AGENCY:

Lucia Mar Unified School District

PROJECT LOCATION:

2101 The Pike, Grover Beach, CA, 93433

BID DUE DATE:

04-21-2022 at 02:00 PM

OUTREACH COORDINATOR:

Brad Edwards

TELEPHONE:

Not Available

FAX:

805-614-9909

ADDRESS:

PO Box 350, Nipomo, CA, 93444

PROJECT DETAILS:

Scope: 

New stick built six classroom building, set two relocatable classrooms, new electrical service. All work to be completed to industry standards and best practices. Further details available in specs. 

Plans are available electronically from be@edwardscongroup.com. All bids and material quotes must be per plans and specifications. All bids are required to be received in our office through our e-mail or fax number at least 1-2 business days before Bid Due Date so that we have ample time to fill out the required bid forms for the owner. Edwards Construction Group, Inc. is an Equal Opportunity Employer. Bonds may be required and subcontractor must agree to our subcontract agreement.

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News Rss Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.