Ohno Construction Company

is seeking certified and qualified DVBE subcontractors and/or suppliers to provide Concrete, Electrical, Asphalt Paving, Fencing, Handrails


PROJECT NAME:

Nuview Bridge Early College High School – Track and Field Replacement

BID CONTRACT #:

Project No. 75-24269-00

AWARDING AGENCY:

Nuview Union School District

PROJECT LOCATION:

30401 Reservoir Ave, Nuevo, CA, 92567

BID DUE DATE:

09-13-2024 at 02:00 PM

OUTREACH COORDINATOR:

Ethel Montano

TELEPHONE:

619-278-8824

FAX:

619-278-8761

ADDRESS:

8884 Jurupa Road, Jurupa Valley, CA, 92509

PROJECT DETAILS:

PROJECT DESCRIPTION:

The work includes, but not be limited to, the clearing of the existing grass fields, installation of new turf subbase and drainage, ADA improvements, new concrete paving and curbing, asphalt paving and pavement markings, installation of new handrails, installation of new track surfacing and upgrades to existing restroom buildings

Location: 30401 Reservoir Ave, Nuevo, CA 92567

Engineers Estimate: $2,500,000

  • This project is subjected to Prevailing Wage
  • DVBE

 

BID DUE DATE & TIME Friday September 13th, 2024 @ 2:00 PM

Proposals may be emailed to the Estimating Department at estimating@ohnoconstruction.com or faxed to 619-278-8761. Quotes are required at least 2 hours prior to bid time. Proposals received after the Bid Due Date and Time will NOT be considered.

BID DOCUMENTS:

Bid documents are available for download from our website. Please note to manually type in the information.  Copy & paste doesn't always work. To access these documents:

https://ohno.sharefile.com/home/shared/fo5d257f-2c3f-4966-827e-069e3d89c5df

Enter Email:                                  ohnocc.ca@gmail.com

Enter Password:                           Yosh1966*

 

Bid documents are provided for your reference only. All takeoff quantities provided by Ohno Construction are for your convenience only. Subcontractors and suppliers are responsible for obtaining all of the information necessary to provide a responsible and accurate quote.

STANDARD REQUIREMENTS:

By submitting a proposal, the bidder acknowledges and agrees to all of the following terms: Proposer has carefully examined ALL the bidding documents/Addenda and that, from his/her own investigation, they have satisfied themselves as to the nature and location of the work. Ohno’s listing of a subcontractor is not an acceptance of any or all of that subcontractor’s conditions, qualifications, exclusions, or exceptions included in the subcontractor’s bid proposal. Ohno is relying on the price submitted in the subcontractor’s proposal as an all-inclusive price for its trade scope found in the plans and specifications regardless of qualifying language in the proposal. Inconsistent bid terms and conditions shall be void. Break outs of any portion of work is permitted as long as specifically and conspicuously called out on proposal. If selected, proposer is prepared to sign a subcontract with Ohno per Ohno’s standard subcontract agreement. A copy of Ohno’s standard subcontract agreement is available at its office locations or upon written request. Ohno Construction reserves the right to request that performance and payment bonds assuring subcontractor’s obligations to Ohno in the amount of 100 percent of the bid to Ohno. Ohno will reimburse the bond premium at actual cost not to exceed 2%. The surety must be a California admitted surety. Insurance must name Ohno as additionally insured and be in an amount required by the specifications. 

 

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News Rss Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.