Stewart Engineering Inc.

is seeking certified and qualified DBE subcontractors and/or suppliers to provide Stewart Engineering Inc. is requesting quotes from all qualified subcontractors and suppliers including certified DBE firms for the following items of work, including but not limited to: Construction Staking, Lead Compliance Plan, Develop Water Supply, Construction Area Signs, Portable Signal System, Traffic Control System, Type III Barricade, Temporary Pavement Marking, Portable Delineator, Temporary Railing (Type K), Job Site Management, Prepare Water Pollution Prevention Plan, Rain Event Action Plan, Temporary Erosion Control, Temporary Silt Fence, Water Quality Sampling and Analysis Day, Water Quality Monitoring Report, Water Quality Annual Report, Temporary Creek Diversion Systems, Contractor Supplied Biologist, Dust Control Plan, Pile Cleaning (Full Length), Temporary High-Visibility Fence, Remove Tree, Clearing and Grubbing, Roadway Excavation, Structure Excavation (Bridge), Structure Excavation (Rock), Structure Excavation (Retaining Wall), Structure Backfill (Bridge), Structure Backfill (Retaining Wall), Imported Borrow, Habitat Restoration (5 Year), Bonded Fiber Matrix, Fiber Rolls, Hydroseed, Class 2 Aggregate Base, Hot Mix Asphalt (Type A, Fiber Reinforced), Place Hot Mix Asphalt Dike (Type F), Place Hot Mix Asphalt (Misc. Area), Remove Asphalt Concrete Pavement, Cold Plane Asphalt Pavement, Rock Dowels, Temporary Trestle, Prestressing Cast-in-Place Concrete, Structural Concrete (Bridge Footing), Structural Concrete (Bridge) Structural Concrete (Bridge, Polymer Fiber), Structural Concrete (Retaining Wall), Joint Seal (MR1.5”), Bar Reinforcing Steel (Bridge), Bar Reinforcing Steel (Retaining Wall), Bar Reinforcing Steel (Epoxy Coated, Bridge), Bar Reinforcing Steel (Galvanized), Bridge Removal, 18” Plastic Pipe, 36” Reinforced Concrete Pipe, Rock Slope Protection (1 T, Class VIII, Method B), Rock Slope Protection (1/2 T, Class VII, Method B), Rock Slope Protection (150 lb, Class III, Method B), Rock Slope Protection (60 lb, Class II, Method B), Rock Slope Protection Fabric (Class 8), Minor Concrete, Misc. Iron and Steel, Frame and Grate, Miscellaneous Metal (Bridge), Obliterate Surfacing, Relocate Gate, Marker (Culvert), Remove Roadside Sign, Reset Roadside Sign, Furnish Single Sheet Aluminum Sign (0.063”-Unframed), Roadside Sign-One Post, Midwest Guardrail System, Rail Element Wall, Tubular Handrailing, Tubular Bicycle Railing, Transition Railing (Type WB-31), Alternative In Line Terminal System, Crash Cushion (Type 732SW), California ST-75 Bridge Rail, Concrete Barrier (Type 842 Modified), Remvoe Guardrail, Paint Traffic Stripe (2-Coast), Mobilization.


PROJECT NAME:

Dog Bar Road over Bear River Bridge Replacement Project

BID CONTRACT #:

Federal Aid Project No. BRLO-5917 (084) Contract No. 224024

AWARDING AGENCY:

County of Nevada Department of Public Works

PROJECT LOCATION:

Dog Bar Road over Bear River Bridge, Nevada City, CA, 95959

BID DUE DATE:

08-13-2024 at 02:30 PM

OUTREACH COORDINATOR:

Renee Thomas

TELEPHONE:

(530) 244-8464

FAX:

(530) 244-8462

ADDRESS:

P.O. Box 990010, Redding, CA, 96099

PROJECT DETAILS:

Stewart Engineering Inc. will be bidding the referenced project as a prime contractor. Plans and specifications for this project may be viewed at your local builders exchange and are available for review in our office. If you require additional information regarding the requirements of the contract, please don’t hesitate to contact our office. In order that we may give your bid maximum consideration, please supply us with a fax or email letter prior to the bid describing the scope of your work.

Stewart Engineering is signatory to the Labors Union Local 185, Pile Drivers Local 34, and Operating Engineers Local 3.  We encourage and actively solicit proposals from DBE subcontractors and suppliers on all our projects. All qualified DBE subcontractors must be registered and certified by the California Department of Transportation.  Prior to the bid, upon request, you can contact our office if you require assistance in bonding, lines of credit, insurance, obtaining necessary equipment, supplies, materials or services etc., which may be required by the Owner.  Subcontractors must possess a current contractor’s license, worker’s compensation and insurance coverage during the entire length of the prime contract.  All Subcontractors will be required to sign our standard Subcontract Agreement (AGC Long Form Standard Subcontract).  If you require an advance copy to of the subcontract to look over please contact our office.  You must be registered and provide your Department of Industrial Relations number

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News Rss Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.