is seeking certified and qualified DVBE subcontractors and/or suppliers to provide Concrete, STructural Steel, Metal fabrications, Metal Ladders, Rough Carpentry, Finish Carpentry, Board and batt insulation, Sheet Metal, Roofing, Doors, Door Frames, Door Hardware, Storefront, Glass, Glazing, Tubular Skylights, Louvers, Remedial Floor Coverings, Gypsum Board, Cold formed Metal Framing, Lath Plaster, Tiling, Acoustical ceilings, Flooring, Painting, Visual Display Units, Signage, Specialties, Athletic Field Equipment, Fire Suppression, Plumbing, HVAC, Electrical, Communications, Fire Alarm, Earthwork, Landscaping, Irrigations, Planting, Paving, Striping, Fence, Gates, Site Utilities
Lange Kindergarten Classroom & Fire Alarm
25-01
Lucia Mar Unified School District
1661 Via Alta Mesa Rd, Nipomo, CA, 93444
09-10-2024 at 02:00 PM
Brad Edwards
805-335-1161
805-614-9909
991 Bennett Avenue, Arroyo Grande, CA, 93420
PROJECT DETAILS:
Edwards Construction Group is currently pursuing the Fillmore Varsity Baseball Field Project in Fillmore School District.
The project includes the Construction of one PC approved scoreboard and overall renovation of the existing baseball field including fencing, dugouts, bull-pens, landscaping, and a drinking fountain. Added concrete walkway next to Public right of way for path of travel.
Please review the plans and specifications via Procore and let us know if you are interested in sending us your bid for this project.
This is a PREVAILING WAGE project.
This Project includes work that will be performed by mechanical, electrical or plumbing (“MEP”) subcontractors (contractors that hold C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43 or C-46 licenses), such MEP subcontractors must also be prequalified. A list of prequalified MEP subcontractors will be made available by the District to all bidders at least five business days prior to the bid opening date. This prequalification requirement applies even if the subcontractor will perform, or is designated to perform, work that does not require one of the licenses listed above, but the subcontractor holds one of the licenses listed above. Prequalification documents must be submitted to Quality Bidders by Tuesday, July 23 at 4:00PM
BID DATE - Please note that the listed due date and time is the time that all completed paperwork is due at the Bid Location. We request that all bids be sent to us no later than 1 hour before the time the bid is due to be considered.
Please call if you have any questions.
Thank you,
Jessica Gregory
Estimating Coordinator
Office: 805-335-1161
Direct: 805-699-6921
Fax: 805-614-9906
E-mail: jg@edwardscongroup.com