is seeking certified and qualified MBE, SBE, WBE and Labor Surplus Firms subcontractors and/or suppliers to provide all bid items, particularly these: Survey, Noise & Vibration Monitoring, Dust Monitoring & Asbestos Testing, Clearing & Grubbing, Well Destruction, Landscape, Storm Drain, Water Line, Pipe Material, Fire Hydrants, Traffic Control, Construction Area Signs & Signs, Fencing & Gates, Rock Slope Protection, Erosion Control, Hydroseeding, Irrigation, Adjust Utilities, Seeding & Planting, Plant Establishment, Minor Concrete, Rebar, Contaminated & Hazardous Soil Off Haul, Soundwall, Control of Water, Trash Racks & Grating, Electrical & PG&E Rule 20, Geotextile Fabric, Quality Control, Directional Bore, SWPPP, Traffic Plans, Biologist and Trucking
Upper Llagas Creek Flood Protection Project Phase 2B
Contract No. C0695
Valley Water
San Martin, CA
06-26-2024 at 02:00 PM
Randy Bonino & Erik Cushman
408-574-1400
408-365-9548
5225 Hellyer Avenue, Suite 220, San Jose, CA, 95138
PROJECT DETAILS:
Plans and Specifications are available in our Estimating Office located at 5225 Hellyer Avenue, Suite #220, San Jose, CA 95138. Graniterock is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons and Carpenters unions. 100% payment and 100% performance bonds in the amount of the subcontractors bid will be required from a qualified surety company. Bonding assistance is available. Graniterock will pay bond premium up to 1.5%. In addition to bonding assistance, subcontractors are encouraged to contact Graniterock Estimating with questions regarding obtaining lines of credit, insurance, equipment, materials and/or supplies, or with any questions you may have. Subcontractors will be required to enter into our standard contract. Subcontractors must possess a current contractor’s license, DIR number, insurance and worker’s compensation coverage. Graniterock will break down items of work to facilitate SBE, MBE, WBE & Labor Surplus Firms participation.