is seeking certified and qualified DBE subcontractors and/or suppliers to provide ADJUST MANHOLES / VALVES, AGGREGATE BASE, CATCH BASINS, CHAIN LINK FENCE, CLEARING AND GRUBBING, COLD MILLING, CONC. STRUCTURES & REBAR (CB’S), CONCRETE, CONSTRUCTION AREA SIGNS, DOWELS & BASKETS, ELECTRICAL, EXCAVATION, FENCING, GRINDING, GUARD RAIL, IMPORT MATERIALS, JOINT SEAL, LANDSCAPE/ IRRIGATION, LOOPS, ROOT PRUNE / BARRIER, SIGNS, SIGN STRUCTURES, SAWCUT, STAMPED / PATTERNED CONCRETE, STORM DRAIN, STREETLIGHTS, STRIPE / MARK, STRUCTURES, SURVEY / SURVEY MONUMENTS, SWPPP, THERMOPLASTIC TRAFFIC STRIPING, TRAFFIC CONTROL, TREE REMOVAL, TRUCKING, UNCLASSIFIED EXCAVATION
BOYLE HEIGHTS/CESAR CHAVEZ GREAT STREETS-BRITTANIA STREET TO EVERGREEN AVENUE
FEDERAL PROJECT NO. CML-5006(879), W.O. E1908099
CITY OF LOS ANGELES
BOYLE HEIGHTS/CESAR CHAVEZ GREAT STREETS-BRITTANIA STREET TO EVERGREEN AVENUE, LOS ANGELES, CA, 90012
06-05-2024 at 10:00 AM
Monica Baldacci
17145789600
714-578-9672
135 S STATE COLLEGE BLVD STE 400, Brea, CA, 92821
PROJECT DETAILS:
An Equal Opportunity Employer
License No. 747612-A
DIR Registration No. 1000003664
135 S. State College Blvd., Suite 400, Brea, CA 92821
Phone: (714) 578-9600 FAX: (714) 578-9672
Contact: Estimating Department
Plans, specifications and project requirements are available for viewing on the Sully-Miller Website: www.sully-millerplans.com, or the City of Los Angeles website www.rampla.org. Sully-Miller is willing to set aside any portion of work, no matter how small to encourage (DBE GOAL-21%) participation. If you require information regarding assistance in obtaining bonding, insurance, credit, equipment, supplies, materials, or related services, please call our office.
100% Payment and Performance bonds May Be Required
PDF ATTACHMENTS: