is seeking certified and qualified MBE and WBE subcontractors and/or suppliers to provide 02 21 13 Construction Surveying 02 41 13 Selective Site Demolition 02 82 13 Asbestos Control Activities 02 83 13 Lead Hazard Control Activities 02 84 13 PCB Hazard Control Activities, 03 11 00 Concrete Forming 03 15 00 Concrete Accessories 03 20 00 Concrete Reinforcing 03 30 00 Cast-in-Place Concrete 03 30 53 Miscellaneous Cast-in-Place Concrete 03 35 00 Concrete Finishing 03 39 00 Concrete Curing 03 48 00 Precast Concrete Specialties 03 60 00 Grouting 03 62 19 Repair Mortar 03 63 01 Epoxies 03 63 02 Epoxy Resin Portland Cement Bonding Agent, 04 22 00 Concrete Masonry Unit, 05 05 14 Hot-Dip Galvanizing 05 05 19 Mechanical Anchoring to Concrete and Masonry 05 05 24 Shop and Field Welding 05 05 26 Flange Bolting 05 12 00 Structural Steel Framing 05 31 00 Steel Decking 05 50 00 Metal Fabrications 05 59 05 Monolithic Insulating Joints, 07 12 00 Bituminous Waterproofing 07 72 25 Roof Vents 07 92 00 Joint Sealants, 08 31 05 Access Hatches and Vault Hatches 08 91 00 Louvers, 09 91 00 Painting 09 96 56.05 High-Build Epoxy Coatings 09 96 56.10 Fusion-Bonded Epoxy Coatings 09 96 57 Mechanical and Electrical Coating Systems 09 97 11 Coating of Dome Roof 09 97 13.15 Coating of Steel Reservoir Interior 09 97 13.25 Coating of Steel Reservoir Exterior (Abrasive Blast), 10 14 00 Signage, 13 33 13 Aluminum Geodesic Dome Reservoir Roof, 22 05 53.05 Pipe Identification, 23 05 03 Testing Adjusting and Balancing HVAC 23 31 13 Metal Ducts 23 33 00 Air Duct Accessories, 26 05 00 Common Work Results for Electrical 26 05 19 Low-Voltage Electrical Power Conductors and Cables 26 05 26 Grounding and Bonding for Electrical Systems 26 05 33 Raceway and Boxes for Electrical Systems 26 05 43 Underground Ducts and Raceways for Electrical Systems 26 05 53 Identification for Electrical Systems 26 08 00 Commissioning of Electrical Systems 26 24 16 Panelboards 26 27 26 Wiring Devices 26 31 00 Standalone Photovoltaic Systems 26 42 19 Reservoir Cathodic Protection Galvanic Anode 26 51 19 LED Interior Lighting, 27 05 00 Common Work Results for Communications, 27 08 00 Commissioning of Communications Systems 27 60 13 Exterior Antenna Systems, 28 13 33.16 Access Control Interfaces to Access Door Control, 31 11 00 Clearing and Grubbing 31 23 16 Excavation 31 23 19 Dewatering 31 23 23 Fill 31 23 23.15 Imported Backfill and Drain Rock Materials 31 23 23.34 Controlled Low Strength Material 31 32 19.25 Geosynthetic Filter Fabric, 32 12 16 Asphalt Concrete Paving 32 12 16.11 Asphalt Concrete Reservoir Base 32 12 16.81 Asphalt Pavement Replacement 32 12 36 Slurry Seal 32 31 13.13 Chain Link Fence and Gates 32 92 19.16 Hydraulic Seeding, 33 05 24.45 Commercial Steel Civil Pipe 33 05 97.25 Tracer Wire for Non-Metallic Underground Utility 33 09 11 Instruments and Recorders 33 10 01 Protection from Corrosion 33 11 03.02 Fabrication of Steel Pipe Specials 33 11 06 Fabricated Pipe Specials 33 11 07 Specialty Couplings for Mechanical Piping 33 11 08 Flexible Ball-Type Expansion Joints 33 11 13 General Pipeline Installation Requirements 33 11 13.05 Installation of Steel Pipe 33 11 13.10 Polywrap 33 11 13.50 Mortar Lining for Steel Pipe 33 11 13.60 Mortar Coating for Steel Pipe 33 11 13.62 Dielectric Coatings for Steel Pipe 33 11 13.80 Cellular Concrete for Filling Abandoned Pipes 33 12 01 Basic Mechanical Materials and Methods 33 12 16.05 Miscellaneous Valves 33 12 16.11 Resilient-Seated Gate Valves 33 12 16.15 AWWA Butterfly Valves 33 12 16.16 High Performance Butterfly Valves 33 12 16.20 Dual-Disc Check Valves 33 12 16.25 Automatic Diaphragm Actuated Valves 33 12 16.32 Electric Motor Valve Actuators 33 12 16.34 Hydraulic and Pneumatic Valve Actuators 33 12 16.51 Altitude Valve Systems 33 12 16.55 Seismic Valve Systems 33 12 27.11 Strainers and Filters 33 12 28.11 Miscellaneous Piping Specialties 33 16 02 Reservoir Draining and Sediment Removal 33 16 04 Reservoir Leakage and Water Quality Testing 33 16 13.10 Steel Aboveground Water Utility Storage Tanks 33 46 16 Subdrainage Piping 33 71 19 Electrical Underground Ducts and Manholes, 40 01 70 Supplemental Training Requirements for Process Integration 40 01 50 Supplemental O&M Manual Requirements for Process Integration 40 05 00 Common Work Results for Process Integration 40 20 20 Mechanical Piping 40 80 00 Commissioning of Process Systems 40 90 00 Instrumentation and Control for Process Systems 40 94 43 Programmable Logic Process Controllers 40 95 13 Process Control Panels and Hardware 40 96 35 Process Control Software Programming, 43 12 16 Reciprocating Air Compressor Packages, 44 31 16.10 Carbon Adsorber System Installation, APPENDIX A Forms and Schedules, APPENDIX B District Approved Disposal Recycling Locations APPENDIX C Listing of Sole Source Products APPENDIX D Pre Demolition Survey APPENDIX E Draft Permits APPENDIX F Noise Ordinances APPENDIX G VOC List APPENDIX H Commissioning Flow Charts APPENDIX I EBMUD Standard Service Agreement


PROJECT NAME:

East of Hills Facilities Demolitions and Improvements

BID CONTRACT #:

2179

AWARDING AGENCY:

East Bay Municipal Utility District

PROJECT LOCATION:

Grizzly Reservoir, located southeast of the end of Lucas Dr. in Lafayette, CA 94549, Castle Hill Reservoir and Castle Hill Regulator site, Crest Radio Site, 225 Sydney Drive, Alamo, CA 94507, and Danville Reservoir, CA,

BID DUE DATE:

04-24-2024 at 01:30 PM

OUTREACH COORDINATOR:

Kelsey Heaphy

TELEPHONE:

4154568972

FAX:

415-459-0665

ADDRESS:

5400 Hanna Ranch Road, Novato, CA, 94945

PROJECT DETAILS:

*No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)] *No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. *This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.

We are signatory to both the Carpenters Collective Bargaining Agreement and the Laborers Collective Bargaining Agreement.  Certification of insurance for General Liability and Workers’ Compensation are required.  A Waiver of Subrogation will also be required with all Subcontract Agreements. Subcontractors’ faithful performance and payment bonds in the amount of the subcontract price will be required.  Reasonable market rate bond premium will be reimbursed by Thompson Builders Corporation.

TBC is willing to discuss breaking down bid items into economically feasible units for minority participation. Our estimating department is available for assistance with bonding, lines of credit, insurance, equipment, supplies and/or materials. The Small Business Administration (www.sba.gov ), the California Dept. of General Services (www.dgs.ca.gov) and U.S. Dept. of Transportation Office of Small and Disadvantaged Business Utilization (www.osdbu.dot.gov ) may also be able to offer financial assistance and/or information regarding insurance and bonding. Plans and specifications may be viewed at various local Builder’s Exchanges, in our office at 5400 Hanna Ranch Road Novato, Monday through Friday  from 7:30 AM to 4:00 PM.  Plans and specifications may be emailed upon request or downloaded from the following link:   

https://tpcorp.box.com/s/7cf7lu4iflp5ryy5d78k3z65599t1r3i

Thompson Builders Corporation is an Equal Opportunity Employer

 Contact:  Kelsey Heaphy

PHONE: (415) 456-8972    EMAIL:  bids@tbcorp.com

Have any questions?

Send us your message and we'll get back to you within one business day at the very latest.

Social Media

Copyright © 2024 Compliance News All rights reserved.