is seeking certified and qualified DVBE subcontractors and/or suppliers to provide BIDS FOR THE IMPERIAL COMMUNITY COLLEGE PHASE 01 – DEMOLITION AND SITE PREPARATION Scope of work to include: the Hazmat Abatement of existing buildings, demolition of those buildings and site work, earthwork excavation and export soils, minor grading, storm drain, cut & cap water & sewer utilities, new electrical feeders, fiber optic low voltage cabling, survey, SWPPP & erosion control, temporary construction fencing.
Imperial Valley College Phase 01 - Demolition and Site Preparation
Not Available
Erickson-Hall Construction Co.
380 E Aten Road, Imperial, CA, 92251
04-18-2024 at 02:00 PM
Summer Lumpkin
760-796-7700
Not Available
500 Corporate Drive, Escondido, CA, 92029
PROJECT DETAILS:
Job Walk: Thursday, 4/4/2024 @ 9:00 am (meet at Erickson-Hall jobsite trailer located South of Building 3100 Trades Education Building)
Project Address: 380 E Aten Road, Building 6600, Imperial, CA 92251
Budget: $2,300,000
RFI’s Due: 4/15/2024 @ 2:00 pm
Bid Date: Thursday, 4/18/2024 @ 2:00 pm
Lead Estimator: Chris Bartok, cbartok@ericksonhall.com
Bid Documents can be obtained by contacting planroom@ericksonhall.com
All bids are to be submitted to Erickson-Hall Construction Co. bids@ericksonhall.com
This project has OCIP insurance requirements. (Each Subcontractor, in order to be enrolled in the OCIP program must have an EMR rating of 1.25 or less over the last 5 years or the current published year. Have zero serious and willful violations and provide evidence of an IIPP.)
Each bidders shall be a licensed contractor in the classification as required for the work to be performed at the time of bid submission.
If you are planning to bid this project, we encourage your participation and welcome your bid. All qualified bidders will receive consideration without regard to race, color, religion, sex or national origin. Erickson-Hall Construction Company requires all subcontractors submitting bids in excess of $50,000 to be prepared to furnish performance and payment bonds issued by a corporate security. Erickson-Hall Construction Company, at its sole discretion, reserves the right to waive this requirement or permit substitute security or alternate guarantees. We offer assistance in obtaining necessary equipment, supplies materials, bonds, lines of credit and insurance.
Subcontractors must comply with general prevailing wage rates (PCC.1720 et seq) and shall be registered with the DIR.CA.gov prior to submitting your bid. EHCC provides notice to all contractors of the adoption of SB 854, which requires all contractors who perform public works projects must be registered with the Department of Industrial Relations. No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after, unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5).
The project is subject to labor compliance monitoring and enforcement by the Department of Industrial Relations pursuant to Labor Code section 1771.4 and Title 8 of the California Code of Regulations. All work of this contract shall comply with applicable provisions of Division 2, Part 7, Chapter 1, of the Labor Code.