Trade Journal

Nicholas Construction, Inc.

is seeking certified and qualified DBE, MBE and WBE subcontractors and/or suppliers to provide SWPPP, DUST CONTROL, SCHEDULING, TEMP OFFICE FACILITIES, TRAFFIC CONTROL, SURVEY, SIGNAGE, SOILS TESTING, TRUCKING, SWEEPING, POTHOLING, CLEARING AND GRUBBING, DEMOLITION, TRENCHING, SHORING, EARTHWORK, DEWATERING, READYMIX AND GENERAL CONCRETE WORK, FORMWORK, WATERWORK EQUIPMENT AND MATERIALS, FITTINGS, SLIDE GATES, ELECTRICAL, AGGREGATE MATERIALS, REINFORCING STEEL, MISCELLANEOUS METAL FABRICATION, JOINT SEALING, TEMP FENCING, PRESSURE AND LEAK TESTING


PROJECT NAME:

THE WEST ENOS RECHARGE FACILITIES EMERGENCY PROJECT - STRUCTURES

BID CONTRACT #:

2024-01

AWARDING AGENCY:

Groundwater Banking Joint Powers Authority

PROJECT LOCATION:

Enos Lane & Brimhall Rd, Just North of 1135 Enos Lane, Bakersfield, CA, 93314

BID DUE DATE:

05-01-2024 at 02:00 PM

OUTREACH COORDINATOR:

Alex Silicz

TELEPHONE:

661-619-7417

FAX:

Not Available

ADDRESS:

251 Carsen Way, Shafter, CA, 93263

PROJECT DETAILS:

We are an Equal Opportunity Employer. If you are planning to bid this project, we encourage your participation and welcome your bid.

All qualified bidders will receive consideration without regard to race, color, religion, sex or national origin. Plans & specs available BY EMAIL REQUEST TO ALEX@NICHOLASCONSTRUCTIONINC.COM.

The major work consists of the installation of district furnished precast interbasin and headwall structures, as well as installation of 36" - 48" HDPE pipe, 27" PVC pipe, and slide gates, and all necessary earthwork and aggregate placement. 

We will assist with Bonds, Lines of Credit and Insurance if needed. Plans & specs available to view in our office.

Assistance is available in obtaining bonds, lines of credit, insurance or other technical information. Plans available from owner or are available for review at our office in 7-DAYS prior to bid day.

Subcontractors will be required to enter into our standard contract. No modifications to the contract are permitted. All subcontractors/vendors awarded work on this project must be able to furnish subcontract performance and payment bonds, for the amount of the subcontract bid, issued by an admitted corporate surety acceptable to our company (If required).

Have any questions?

Send us your message and we'll get back to you within one business day at the very latest.

Social Media

Copyright © 2024 Compliance News All rights reserved.