is seeking certified and qualified DVBE subcontractors and/or suppliers to provide BIDS FOR THE RANCHO BERNARDO HS CHILLER REPLACEMENT PROJECT Scope of work to include: Replace existing central utility plant equipment including the heating hot water boilers, chillers, cooling towers and pumps. New chilled and heating hot water piping distribution system. Construction of steel support structures, cover walkways and self standing shaft to route pipes to point of connections. This project requires prequalification. Poway Unified School District requires General Contractors and certain subcontractors to be prequalified on all bond-funded Construction Contracts. The following license classifications must prequalify: A, B, C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43, C-46. Poway Unified School District uses PQBids (www.pqbids.com) to manage AB 1565 contractor registration and approvals.
Rancho Bernardo High School Chiller Project
Not Available
Erickson-Hall Construction Co.
13010 Paseo Lucido, San Diego, CA, 92128
03-19-2024 at 02:00 PM
Summer Lumpkin
760-796-7700
Not Available
500 Corporate Drive, Escondido, CA, 92029
PROJECT DETAILS:
Job Walk: 2/28/24 @ 8:00 AM (non-mandatory)
Prequalification Due: 3/5/2024
RFI Deadline 3/5/2024
Bid Date: 3/19/2024 @ 2:00 PM
Lead Estimator: Emiliano Springer espringer@ericksonhall.com
Project Address: 13010 Paseo Lucido, San Diego, CA 92128
Bid Documents can be obtained by contacting planroom@ericksonhall.com
All bids are to be submitted to Erickson-Hall Construction Co. bids@ericksonhall.com
This project requires Prevailing Wage, Skilled & Trained Workforce
If you are planning to bid this project, we encourage your participation and welcome your bid. All qualified bidders will receive consideration without regard to race, color, religion, sex or national origin. Erickson-Hall Construction Company requires all subcontractors submitting bids in excess of $50,000 to be prepared to furnish performance and payment bonds issued by a corporate security. Erickson-Hall Construction Company, at its sole discretion, reserves the right to waive this requirement or permit substitute security or alternate guarantees. We offer assistance in obtaining necessary equipment, supplies materials, bonds, lines of credit and insurance.
Erickson-Hall Construction provides notice to all contractors of the adoption of SB 854, this requires subcontractors to comply with the requirements as set forth on the Department of Industrial Relations (DIR) website at http://www.dir.ca.gov/Public-Works/publicworks.html. SB 854 requires all contractors who perform public works projects must be registered with the Department of Industrial Relations. No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after, unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5).