Sausal Corporation

is seeking certified and qualified DVBE subcontractors and/or suppliers to provide 02 40 00 Demolition, 02 41 20 Selective Building Demolition, 02 43 20 Structure Moving, 05 52 00 Metal Railing, 10 14 00 Signage, 10 44 00 Fire Extinguisher Cabinets, 11 68 16 Play Structures, 12 93 00 Site Furnishings, 26 00 00 General Electrical Requirements, 28 31 00 Fire Detection and Alarm System, 31 10 00 Site Clearing, 31 20 00 Earth Moving, 31 21 00 Utility Trenching and Backfill, 32 11 00 Pavement Base Course, 32 11 23.1 Permeable Aggregate Base Course, 32 12 16 Asphalt Paving, 32 12 16.1 Asphalt Paving (Landscape), 32 12 33 Paving Colored Surfacing, 32 12 33.1 Sport Court Surfacing, 32 12 93.10 Synthetic Sport Field, 32 13 13 Concrete Pavement, 32 13 13.1 Concrete Work (Landscape), 32 13 18 Cement and Concrete for Exterior Improvements, 32 13 75 Concrete Curb and Gutters, 32 17 23 Pavement Markings 32 18 13 Synthetic Grass Surfacing, 32 18 16.13 Playground Protective Surfacing, 32 18 23.39 Running Track Surfacing, 32 31 13 Chain Link Fencing and Gates, 32 84 00 Planting Irrigation, 32 90 00 Planting, 33 10 00 Water System, 33 30 00 Sanitary Sewer System and 33 41 00 Storm Utility Drainage Piping


PROJECT NAME:

CESAR CHAVEZ RAVENSWOOD MIDDLE SCHOOL MAGICAL BRIDGE PROJECT

BID CONTRACT #:

BID NUMBER: 2024-CCRMS-011

AWARDING AGENCY:

Ravenswood City School District

PROJECT LOCATION:

2450 Ralmar Ave, East Palo Alto, CA, 94303

BID DUE DATE:

02-21-2024 at 12:45 PM

OUTREACH COORDINATOR:

Teena Singley

TELEPHONE:

9255682200

FAX:

Not Available

ADDRESS:

3550 Willow Pass Road, Concord, CA, 94519

PROJECT DETAILS:

“We are an Equal Opportunity Employer. If you are planning to bid this project, we encourage your participation and welcome your bid.
All qualified bidders will receive consideration without regard to race, color, religion, sex or national origin. Plans & specs available through dropbox link below https://www.sausalplans.net/#files/share/4993F39003”

‘We will assist with Bonds, Lines of Credit and Insurance if needed. Plans & specs available to view in our office.”

“Assistance is available in obtaining bonds, lines of credit, insurance or other technical information. Plans available from owner or are available for review at our office in today and prior to bid day.”

“Subcontractors will be required to enter into our standard contract. No modifications to the contract are permitted. All subcontractors/vendors awarded work on this project must be able to furnish subcontract performance and payment bonds, for the amount of the subcontract bid, issued by an admitted corporate surety acceptable to our company (If required).”

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News Rss Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.