is seeking certified and qualified DBE, DVBE, HUD Section 3, MBE, SBE and WBE subcontractors and/or suppliers to provide Rough Clean Up, Final Clean Up, Earthwork, Landscaping and Irrigation, Survey, Temp Fence, Domestic Water, Fire Water, Sewer, Storm Drain, Dry Utilities, Onsite Improvements, Site Fencing and Gates, Radon Mitigation, Concrete Foundations, Lightweight Concrete and Sound Mat, Masonry, Misc. Steel, Rough Carpentry, Finish Carpentry, Cabinets and Millwork, Waterproofing, Insulation, Roofing, Sheet Metal, Fireproofing, Doors, Frames, Hardware, Smoke Doors, Windows, Storefront Glazing, Drywall, Lath and Plaster, Tile, Countertops, Flooring, Painting, Code Signage, Mirrors, Appliances, Window Coverings, Carports, Trash Chutes, Elevators, Fire Sprinklers, Plumbing and Fixtures, HVAC, HERS and Greenpoint Rater and Certification, Electrical, Low Voltage, Solar Photovoltaic System.
Village Senior Apartments
Not Available
Cabrillo Economic Development Corporation
332 & 334 Valley Vineyard Circle, Buellton, CA, 93427
02-09-2024 at 05:00 PM
Matt Sinsky
(805) 485-4646
Not Available
721 E. Main St , Ventura, CA, 93001
PROJECT DETAILS:
The Project is a new construction multi-family residential development on a 1.99-acre vacant lot site located in a master plan community, consisting of (1) F-shaped two-story building with 50 units of affordable senior housing with access provided to the second-floor units by (1) elevator. The proposed 47,165 square foot total floor area includes the 50 units consisting of (44) one-bedrooms, and (6) two-bedrooms, typical residential utility spaces, (4) laundry rooms, and lobby entry. The first floor will have a community room (1250 SF), (2) laundry rooms (133 SF each), supportive services offices, the second floor will have an additional (2) laundry rooms (133 SF each). The grounds will feature a community garden space (2500 SF), rose garden (2097 SF), seating and gathering space (763 SF), as well as a trellis and seating area (586 SF). The Project includes two developed and landscaped courtyard areas, and all facilities are accessible with an ADA path of travel. Access to the interior of the property and amenities will be gated to prevent public access. The Project will be compliant with the California Green Building Standards Code and GreenPoint Checklist which specifies the type of material which can be used and the construction standard for installing these materials. The Project will also include Photovoltaic panels, which will be design- build along with (3) EV charging stations for residential use.
RFI Deadline - 2/2/24 at 5:00pm
Prevailing Wage Requirement: Higher of Federal or State Prevailing Wage