is seeking certified and qualified DBE subcontractors and/or suppliers to provide Granite Construction Company is seeking DBE Subs/Suppliers for participation on this project. All items of work are available, including (but not limited to) the following suggested items: Lead Compliance Plan; SWPP Plan and Annual Report; Construction Area Signs; Traffic Control & Flagging; Crash Cushion; All Other Signs (including Roadside Signs and Custom Trail & Park Signage); All Erosion Control items; Hydroseeding/Hydromulch; Soil Amendments; Clearing & Tree Removal; All Planting/Landscaping items, including Trees & Tree Biofilter; All Irrigation items; All Site Furnishings (including Park and Trail Furniture & Fixtures); Tennis Court Sealing & Resurfacing; All Fencing items; Tubular Bicycle Railing; Handrailing; All Cable Rail and Guardrail items; Reset Mailboxes; Rock Slope Protection; Slurry Seal; Tennis Court Surfacing; HMA Dike; Pipe & Drainage materials; Bioretention Pond; Sanitary Sewer System; Sewer Bypass; CCTV Inspection; Adjust Utilities; Pile Driving; Steel Soldier Pile; 36” Drilled Hole; Clean & Paint Steel Soldier Piling; Structural Concrete; Retaining Wall; Precast Prestressed Concrete; Concrete Barriers; Concrete Surface Texture; Rebar; Concrete Pumping; Minor Concrete items; Detectable Warning Surface; Misc. Metal items; Temporary Shoring; Joint Seal; Concrete Removals; Sawcutting; All Striping & Marking items; All Electrical, Signal & Lighting items; Survey & Staking; Timber Lagging; Street Sweeping; Materials Supply; Materials Trucking. Please contact our office if there are additional items, or portions of items, your firm is interested in bidding. Granite Construction will break down items of work to facilitate DBE participation on this project. All non-DBE subcontractors are also encouraged to utilize DBE suppliers for their work, where possible. Call Patricia Arnett with Granite, at (831) 763-6100 if you need help locating a DBE supplier. Please include any DBE participation information with your quote.
Fort Ord Regional Trail and Greenway (FORTAG) Canyon del Rey Regional Trail Segment 1
ATPSB1L-6143(088)
Transportation Agency for Monterey County (TAMC)
between Fremont Boulevard and Plumas Avenue in Del Rey Oaks, Del Rey Oaks (Monterey County), CA, 93940
01-25-2024 at 02:00 PM
Patricia Arnett
831-763-6100
831-761-1042
580 West Beach Street, Watsonville, CA, 95077
PROJECT DETAILS:
PLANS:
Plans and specifications are available for downloading from our planroom: https://securecc.smartinsight.co/#/PublicBidProject/739141
Or can be downloaded directly from the TAMC website:
https://www.tamcmonterey.org/fortag-canyon-del-rey-call-for-construction-bids
Please call or email Patricia Arnett for assistance with plans, or if you need assistance in obtaining bonding, insurance, equipment, materials and/or supplies. Granite intends to work cooperatively with all qualified DBE firms seeking work on this project. Granite is an equal opportunity employer.
REQUIREMENTS:
Granite Construction Company is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons and Carpenters unions.
100% performance and payment bonds may be required for the full amount of subcontract price. Granite Construction will assist with bonding costs for subcontractors. The US Small Business Administration may also assist you in obtaining bonding - please see the following site for information: http://www.sba.gov/content/contractors#
Subcontractors must possess a current contractor’s license and current DIR number. All quotes are subject to the terms of Granite Construction Company’s applicable standard form agreement which is available through the following link: https://www.graniteconstruction.com/ca-resources/quote-solicitation