Granite Rock Company

is seeking certified and qualified DBE, DVBE and UDBE subcontractors and/or suppliers to provide all bid items, particularly these: Lead Compliance Plan, Construction Area Signs, SWPPP, Temporary Erosion Control, Street Sweeping, Remove Trees, Electrical, Clearing & Grubbing, Retaining Wall, Erosion Control, Hydroseed, Landscape, Adjust Utilities, Park Furniture / Site Furnishings, Signs, Fencing & Gates, Rock Slope Protection, Slurry Seal, AC Dike, Structure Backfill, Piling, Structural Concrete, Precast Bridge / Deck, Painting, Lagging, Form Liner, Murals / Art Work, Joint Seal, Rebar, Crash Cushions, Concrete Barrier, CIDH, Misc. Metal, Minor Concrete, Guardrail, Striping & Markings, Foot Bridge and Trucking


PROJECT NAME:

Fort Ord Regional Trail and Greenway (FORTAG) Canyon Del Rey Segment 1

BID CONTRACT #:

TAMC Project No. 7300.01.CDR.01 – Federal Aid Project No. ATPSB1L-6143 (088)

AWARDING AGENCY:

Transportation Agency for Monterey County (TAMC)

PROJECT LOCATION:

Del Rey Oaks, CA

BID DUE DATE:

02-15-2024 at 02:00 PM

OUTREACH COORDINATOR:

Randy Bonino & David Kennedy

TELEPHONE:

408-574-1400

FAX:

408-365-9548

ADDRESS:

5225 Hellyer Avenue, Suite 220, San Jose, CA, 95138

PROJECT DETAILS:

Plans and Specifications are available in our Estimating Office located at 5225 Hellyer Avenue, Suite #220, San Jose, CA 95138. Graniterock is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons and Carpenters unions. 100% payment and 100% performance bonds in the amount of the subcontractors bid will be required from a qualified surety company. Bonding assistance is available. Graniterock will pay bond premium up to 1.5%. In addition to bonding assistance, subcontractors are encouraged to contact Graniterock Estimating with questions regarding obtaining lines of credit, insurance, equipment, materials and/or supplies, or with any questions you may have. Subcontractors will be required to enter into our standard contract. Subcontractors must possess a current contractor’s license, DIR number, insurance and worker’s compensation coverage. Graniterock will break down items of work to facilitate DBE, UDBE and DVBE firms participation.

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News Rss Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.