Bosco Constructors, Inc.

is seeking certified and qualified DVBE subcontractors and/or suppliers to provide Is seeking certified and qualified subcontractors and/or suppliers to provide Bosco Constructors, Inc the following project elements, including but not limited to LEAD COMPLIANCE PLAN, LEVEL 2 CRITICAL PATH METHOD SCHEDULE, TIME-RELATED OVERHEAD (WDAY) WDAY 270, DISPUTE RESOLUTION ADVISOR ON-SITE MEETING, HOURLY OFF-SITE DISPUTE-RESOLUTION ADVISOR-RELATED TASKS HR, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, TEMPORARY TRAFFIC STRIPE (PAINT), CHANNELIZER (SURFACE MOUNTED), PLASTIC TRAFFIC DRUMS, TEMPORARY BARRIER SYSTEM, TEMPORARY CRASH CUSHION MODULE, AUTOMATED FLAGGER ASSISTANCE DEVICE, JOB SITE MANAGEMENT, STORMWATER POLLUTION PREVENTION PLAN, STORM WATER SAMPLING AND ANALYSIS DAY, STORM WATER ANNUAL REPORT, TEMPORARY COVER, TEMPORARY DRAINAGE INLET PROTECTION, TEMPORARY FIBER ROLL, TEMPORARY GRAVEL BAG BERM, STREET SWEEPING, TEMPORARY CONCRETE WASHOUT, REMOVE YELLOW THERMOPLASTIC TRAFFIC STRIPE (HAZARDOUS WASTE), TREATED WOOD WASTE, INVASIVE SPECIES CONTROL, REMOVE CONCRETE, REMOVE CONCRETE (STRUCTURE), CLEARING AND GRUBBING, ROADWAY EXCAVATION, ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD), ROADSIDE CLEARING, ROCK BLANKET, CHECK AND TEST EXISTING IRRIGATION FACILITIES, REMOVE IRRIGATION FACILITY, 1" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 1 1/2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 3" PLASTIC PIPE (CLASS 315) (SUPPLY LINE), PVC PIPE CONDUIT (SLEEVE), 8" CORRUGATED HIGH DENSITY POLYETHYLENE PIPE CONDUIT, CLASS 2 AGGREGATE BASE, CLASS 3 AGGREGATE BASE, LEAN CONCRETE BASE RAPID SETTING, BASE BOND BREAKER, HOT MIX ASPHALT (TYPE A), PLACE HOT MIX ASPHALT DIKE (TYPE A), PLACE HOT MIX ASPHALT DIKE (TYPE C), PLACE HOT MIX ASPHALT DIKE (TYPE E), PLACE HOT MIX ASPHALT DIKE (TYPE F), PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA), REMOVE ASPHALT CONCRETE PAVEMENT, REMOVE ASPHALT CONCRETE DIKE, REMOVE BASE AND SURFACING, DRILL AND BOND (DOWEL BAR), DRILL AND BOND (TIE BAR), INDIVIDUAL SLAB REPLACEMENT (RSC), REMOVE CONCRETE PAVEMENT AND BASE, STRUCTURAL CONCRETE, DRAINAGE, MINOR CONCRETE (MINOR STRUCTURE), MINOR CONCRETE (BACKFILL), DESIGN POLLUTION PREVENTION, INFILTRATION AREA (ROCK INFILL), 18" REINFORCED CONCRETE PIPE, 24" REINFORCED CONCRETE PIPE, 30" REINFORCED CONCRETE PIPE, 36" CORRUGATED STEEL PIPE (.109" THICK), 18" SLOTTED CORRUGATED STEEL PIPE (.079" THICK), 24" CORRUGATED STEEL PIPE DOWNDRAIN (.109" THICK), CONCRETE ANCHOR AND CABLE ASSEMBLY, 24" STEEL FLARED END SECTION, ABANDON CULVERT, REMOVE PIPE, REMOVE INLET, CLEANING, INSPECTING, AND PREPARING CULVERT, SAND BACKFILL, 18" CURED-IN-PLACE PIPELINER, 24" CURED-IN-PLACE PIPELINER, 30" CURED-IN-PLACE PIPELINER, 36" CURED-IN-PLACE PIPELINER, CURED-IN-PLACE PIPELINER, CONCRETE (DITCH LINING), SLOPE PAVING (CONCRETE), ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B), ROCK SLOPE PROTECTION FABRIC (CLASS 8), MINOR CONCRETE (GUTTER), MINOR CONCRETE (BRUSHED CONCRETE), MINOR CONCRETE (STAMPED CONCRETE), REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK), MISCELLANEOUS IRON AND STEEL, STAIN GALVANIZED SURFACES, REMOVE PAVEMENT MARKER, GUARD RAILING DELINEATOR, PAVEMENT MARKER (RETROREFLECTIVE), TREATMENT BEST MANAGEMENT PRACTICE MARKER, RESET ROADSIDE SIGN (ONE POST), RESET ROADSIDE SIGN (TWO POST), ROADSIDE SIGN - ONE POST, MIDWEST GUARDRAIL SYSTEM (WOOD POST), VEGETATION CONTROL (MINOR CONCRETE), CABLE RAILING, TRANSITION RAILING (TYPE WB-31), ALTERNATIVE IN-LINE TERMINAL TL-3, CONCRETE BARRIER TRANSITION, REMOVE GUARDRAIL, RECONSTRUCT GUARDRAIL, REMOVE METAL RAILING, 6” THERMOPLASTIC TRAFFIC STRIPE LF 5,410, 6" THERMOPLASTIC TRAFFIC STRIPE (BROKEN 18-12), THERMOPLASTIC TRAFFIC STRIPE, REMOVE THERMOPLASTIC TRAFFIC STRIPE, MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION, MODIFYING LIGHTING SYSTEMS, MODIFYING RAMP METERING SYSTEMS, MODIFYING TRAFFIC MONITORING STATIONS


PROJECT NAME:

07-355404 - CONSTRUCTION ON STATE HIGHWAY IN LOS ANGELES COUNTY ON ROUTE 2 FROM 1.0 MILE NORTH OF CLIFFORD STREET TO MOUNT WATERMAN SKI LIFTS AND ON ROUTE 210 FROM 0.5 MILE EAST OF OCEAN VIEW BOULVEARD OVERCROSSING TO 0.2 MILE EAST OF ALTA CANYADA ROAD OVERCROSSING

BID CONTRACT #:

07-355404

AWARDING AGENCY:

STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION

PROJECT LOCATION:

Route 2 & 210, La Cañada Flintridge, CA, 91011

BID DUE DATE:

01-10-2024 at 02:00 PM

OUTREACH COORDINATOR:

Christian Ortega

TELEPHONE:

(818) 700-0304

FAX:

(818) 280-3444

ADDRESS:

21353 Mayall St. Chatsworth, Chatsworth, CA, 91311

PROJECT DETAILS:

DRAWINGS

https://www.dropbox.com/scl/fo/iejcnx626ljku6h6z8pyj/h?rlkey=nkbpe5l7vxwdpk27i9h0nqoe5&dl=0

SPECIFICATIONS

https://www.dropbox.com/scl/fo/d8z84cskkp5rejsjc4t20/h?rlkey=cy7ud1b2p8r4gqely7feiwx4j&dl=0

ADDENDUM

https://www.dropbox.com/scl/fo/vvf5ez4dcbschpbbmxqgd/h?rlkey=c7b9gfan90vsd28xap0qwggez&dl=0

 

Bosco Constructors Inc. is an equal opportunity employer. Bosco Constructors Inc. will provide assistance including but not limited to obtaining bonding, lines of credit, insurance, necessary equipment, supplies and/or materials upon request. Please ensure all communications contain an existing/ active license, DIR Registration, along with related certifications if any.

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News Rss Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.