is seeking certified and qualified DVBE subcontractors and/or suppliers to provide Concrete, Electrical, HVAC, Plumbing, Concrete, Rebar, Asphalt, Fencing, Landscape and Irrigation, Court Surfacing, Metal Fabrication, Bleachers, Scoreboards, Athletic Equipment, Prefabricated Restroom, Lunch Shelter, Ticket Booth, Tiling, Doors Windows, Painting, Ceiling and Drywall, Toilet Partitions, etc.
William Workman High School Stadium
2023-24.04
Hacienda La Puente Unified School District
6303 E Temple Avenue, City of Industry, CA, 91744
10-31-2023 at 05:00 PM
Raquel Tomas
619-278-8824
619-278-8761
8884 Jurupa Road, Jurupa Valley, CA, 92509
PROJECT DETAILS:
Ohno Construction invites your firm to submit a bid for the following project:
William Workman High School Stadium
Hacienda La Puente Unified School District
PROJECT DESCRIPTION:
This project consists of the construction of (1) New Football Field, (2) Tennis Courts, (1) 12x40 Restroom Portable, (1) 20x30 Shade Structure, (1) 8x20 Ticket Booth, (2) Bleachers, Pressbox, and Athletic Facility Improvements. There will be Outdoor Scoreboard, Restore Existing Tennis Courts, Paving, Masonry, Ramps/Landings and Stairs, Retaining Walls, Fencing (Chainlink and Ornamental), Railings, Landscaping & Irrigation, Seeding & Field Sod, Mechanical & Plumbing, and Electrical, Alterations to Existing Restrooms, and other site works.
Alternate #1: Fencing (Modify chainlink fencing at northern perimeter of site adjacent to track)
Alternate #2: Infilled Synthetic Turf (Modify natural turf surfacing area and grading north of the track to accommodate synthetic turf surfacing)
Location: 6303 E Temple Avenue, City of Industry, CA 91744
RFI Due: 12nn, October 20, 2023
Project Schedule: 600 calendar days, anticipated date of award is December 14, 2023
Labor/Wage: PLA – Continuity of Work Agreement
All DVBEs are encouraged to participate.
Continuity of Work Agreement & Amendment No. 1 (refer to Section 11 of the Bid Documents)
Please refer to the Hacienda La Puente USD website for all current COVID-19 Guidelines.
BID DUE DATE & TIME: Tuesday, October 31, 2023 at 2pm
Proposals may be emailed to the Estimating Department at estimating@ohnoconstruction.com or faxed to 619-278-8761.
Bid due to Owner is November 01st but we are requesting all subcontractor bids be sent to us a day before the published bid date to allow us time for evaluation and entry.
BID DOCUMENTS:
Bid documents are available for download from our website. To access these documents:
https://ohno.sharefile.com/home/shared/foec5753-9bf3-4712-a05b-a9280ff83cf4
Enter Email : ohnocc.ca@gmail.com
Enter Password : Yosh1966*
Bid documents are provided for your reference only. All takeoff quantities provided by Ohno Construction are for your convenience only. Subcontractors and suppliers are responsible for obtaining all of the information necessary to provide a responsible and accurate quote.
STANDARD REQUIREMENTS:
By submitting a proposal, the bidder acknowledges and agrees to all of the following terms: Proposer has carefully examined ALL the bidding documents/Addenda and that, from his/her own investigation, they have satisfied themselves as to the nature and location of the work. Ohno’s listing of a subcontractor is not an acceptance of any or all of that subcontractor’s conditions, qualifications, exclusions, or exceptions included in the subcontractor’s bid proposal. Ohno is relying on the price submitted in the subcontractor’s proposal as an all-inclusive price for its trade scope found in the plans and specifications regardless of qualifying language in the proposal. Inconsistent bid terms and conditions shall be void. Break outs of any portion of work is permitted as long as specifically and conspicuously called out on proposal. If selected, proposer is prepared to sign a subcontract with Ohno per Ohno’s standard subcontract agreement. A copy of Ohno’s standard subcontract agreement is available at its office locations or upon written request. Ohno Construction reserves the right to request that performance and payment bonds assuring subcontractor’s obligations to Ohno in the amount of 100 percent of the bid to Ohno. Ohno will reimburse the bond premium at actual cost not to exceed 2%. The surety must be a California admitted surety. Insurance must name Ohno as additionally insured and be in an amount required by the specifications.
PDF ATTACHMENTS: