Stacy and Witbeck, Inc.

is seeking certified and qualified DBE subcontractors and/or suppliers to provide Stacy and Witbeck, Inc. quotes from all certified and qualified subcontractors and suppliers including DBE firms for the following items of work, including but not limited to Dewatering, Shoring, Construction Signs, Striping, Traffic Control, Underground Utilities, Cast-In-Drilled-Hole Concrete Piles, Furnish and Install H-Piles, Furnish and Install Sheet Piles, Reinforcing Steel, Pre-Cast Concrete, Demolition and Removal, Track Construction, Waterproofing, Painting & Anti-Graffiti Coating, Fence & Guardrail, Structural Steel, Bridge Deck Drainage, Misc. Metals, Bridge Bearings, Soldier Pile Wall, Concrete Flatwork, Asphalt Paving, Sawcutting, Core Drill, Landscape & Irrigation, Tree Removal, Electrical, QAQC, Survey, SWPP Plan, Construction Office, Trucking, Water Truck, Street Sweeper, Traffic Control Equipment Rental, Ready Mix Concrete Supply, Precast Concrete Supply, Aggregate Supply, Rip-Rap, Pipe Supply, Pipe Supply, Misc. Metals Supply, Pump Supply, Valves Supply, Flow Meters Supply, Track Materials, Concrete Formliner, and Equipment Rental. Stacy and Witbeck, Inc. will work with interested subcontractors to identify opportunities to break down items into economically feasible packages.


PROJECT NAME:

San Juan Creek Bridge Replacement

BID CONTRACT #:

C3153-24

AWARDING AGENCY:

Southern California Regional Rail Authority, Metrolink Regional Rail System

PROJECT LOCATION:

32401 Camino Capistrano, San Juan Capistrano, CA, 92675

BID DUE DATE:

09-15-2023 at 02:00 PM

OUTREACH COORDINATOR:

Cecilia George

TELEPHONE:

510.748.1870

FAX:

510.748.1205

ADDRESS:

2800 Harbor Bay Parkway, Alameda, CA, 94502

PROJECT DETAILS:

The project includes a 12.71% DBE Goal. Plans and specs including the bid package and any addenda modifying the project plans and manuals are located in the Files tab in BuildingConnected, or you can also access the documents at our public Box site: https://stacywitbeck.box.com/s/31uinmimgi54z6bdrhqx6rmgdfze3uak

All subcontractors must possess a current contractor’s license, insurance, and worker’s comp insurance coverage meeting Stacy and Witbeck’s requirements. A copy of the insurance requirements and agreements can be obtained by contacting the estimator. In addition, subcontractors are required to register with the Department of Industrial Relations (DIR), as required by Public Contract Code Section 1725.5, please furnish the DIR number with your quote submittal. Include applicable DBE certifications issued and validated by pertinent agencies. Stacy and Witbeck, Inc. is an Affirmative Action/EEO company and is willing to assist qualified certified DBE and other small business certified firms to achieve our subcontractor/supplier goals. Subcontractors will be required to provide a 100% performance and 100% payment bond for the full amount of the subcontract price. Items of work may be broken down into economically feasible packages to encourage participation. Please also provide bond rates with your submitted bids. In some cases, we may be able to provide assistance obtaining bonds, line of credit, insurance, necessary equipment, supplies, and materials, as well as any related assistance in services to subcontractors who may otherwise be at a disadvantage. 

Additional Information:

DBE must be certified by the California Unified Certification Program (CUCP) and must be listed as a certified DBE on the CUCP website: https://caltrans.dbesystem.com.

 

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News Rss Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.