Edwards Construction Group

is seeking certified and qualified DVBE subcontractors and/or suppliers to provide demolition, metal fabrication, pipe and tube railings, sheet metal, joint sealants, door hardware, painting, signage, furnishings, seating, bleachers, storm drain, plumbing, piping, parking lots, pavement markings, asbestos, lead, abatement, concrete, rough carpentry, finish carpentry, cabinets, millwork, waterproofing, thermal insulation, acoustical insulation, roofing, fire-stopping, hollow metal doors and frames, access doors, glazing, moisture vapor control, cement plaster, gypsum board, framing, ceramic tiling, acoustical tile ceilings, resilient base, tile carpeting, toilet accessories, fire protection cabinets, fire extinguishers, play structures, playground equipment, blinds, window treatments, countertops, water stations, HVAC, electrical, lighting, communications, fire alarm, security, earthwork, paving, asphalt, ADA, playground surfacing, planting, irrigation, landscaping, chain link fences, site utilities


PROJECT NAME:

Balboa ES Site Modernization and Lincoln HS DSA Certification

BID CONTRACT #:

CC24-0220-52-00-00

AWARDING AGENCY:

San Diego Unified School District

PROJECT LOCATION:

1844 South 40th St., San Diego, CA, 92113

BID DUE DATE:

08-10-2023 at 01:00 PM

OUTREACH COORDINATOR:

Maranda Maliska

TELEPHONE:

661-972-0503

FAX:

805-614-9909

ADDRESS:

4350 Executive Dr, Ste 205, San Diego, CA, 92121

PROJECT DETAILS:

Edwards Construction Group is currently perusing the Balboa ES Site Modernization and Lincoln HS DSA Certification project for the San Diego Unified School District. The project includes 2 schools: 

  • Balboa Elementary School: Existing Classroom Building 100 interior finish upgrades, restroom renovation and exterior paint. New playground and play structure, fencing, site ramp, site lighting and (1) fabric shade structure. North parking lot and playground reconfiguration including new fencing, hard surfacing, and accessible parking.
  • Lincoln High School: Rectify conditions at Lincoln High School to align with originally approved DSA project 04-105819 for final certification by inspection team with DSA.  Scope includes corrections to door hardware, door louvers, and door certifications, installation of welded guardrails, fixed connections for storm water piping, modifications to auditorium seating, restriping of parking spaces, relocation of wheel stops, installation of signage, and bleacher modifications for originally approved door swing and landing design.

This is a PREVAILING WAGE project.

This project includes a PROJECT STABILIZATION AGREEMENT (PSA).

Plans & Specs are available electronically from mm@edwardscongroup.com. All bids and material quotes must be per plans and specifications. All bids are required to be received in our office through our e-mail at least 1-2 business days before Bid Due Date so that we have ample time to fill out the required bid forms for the owner.

Edwards Construction Group, Inc. is an Equal Opportunity Employer. Bonds may be required and subcontractor must agree to our subcontract agreement.

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News Rss Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.