is seeking certified and qualified DVBE and SBE subcontractors and/or suppliers to provide asbestos, abatement, painting, fence, fencing, toilets, porta potty, plumbing
SVERDRUP HALL SEWER AND STORM DRAIN PIPES RENEWAL
75964 / P4L-258
UNIVERSITY OF CALIFORNIA, SAN DIEGO
8615 Kennel Way, La Jolla, CA, 92037
07-19-2023 at 02:00 PM
Maranda Maliska
661-972-0503
805-614-9909
4350 Executive Dr, Ste 205, San Diego, CA, 92121
PROJECT DETAILS:
Scope:
Sverdrup Hall is a research lab building located at UC San Diego Scripps Institutes of Oceanography campus. The MEP utilities reside within a large, multi-story utility chase. The plumbing waste and sewer lines within the core and serving Sverdrup Hall are 60 years old and have reached the end of their useful. The objective of this project is to replace the system storm drain, lab acid waste and sanitary sewer piping. The scope is to replace the existing interior storm drain piping and fittings and existing sanitary sewer and vent branch lines and stacks within the chase space. Both systems to be replaced with new flame-retardant polypropylene pipe and fittings.
This is a Prevailing Wage project. All work to be completed to industry standards and best practices. Further details available in specs.
Plans & Specs are available electronically from mm@edwardscongroup.com. All bids and material quotes must be per plans and specifications. All bids are required to be received in our office through our e-mail at least 1-2 business days before Bid Due Date so that we have ample time to fill out the required bid forms for the owner. Edwards Construction Group, Inc. is an Equal Opportunity Employer. Bonds may be required and subcontractor must agree to our subcontract agreement.