Trade Journal

Steelhead Constructors JV

is seeking certified and qualified DBE subcontractors and/or suppliers to provide We are requesting quotes from all qualified subcontractors and suppliers, including all certified DVBE/DBE/MBE/WBE/MB subcontractors. We are soliciting quotes for (including but not limited to): LEVEL 2 CRITICAL PATH METHOD SCHEDULE TIME-RELATED OVERHEAD (WDAY) DISPUTE RESOLUTION BOARD ON-SITE MEETING HOURLY OFF-SITE DISPUTE-RESOLUTION-BOARD-RELATED TASKS CONSTRUCTION AREA SIGNS TRAFFIC CONTROL SYSTEM TRAFFIC CONTROL SUPERVISOR TRAFFIC CONE PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM DAY PORTABLE CAMERA SYSTEM PORTABLE VARIABLE SPEED LIMIT SIGN SYSTEM PORTABLE CHANGEABLE MESSAGE SIGN (LS) AUTOMATED FLAGGER ASSISTANCE DEVICE DAY JOB SITE MANAGEMENT PREPARE STORM WATER POLLUTION PREVENTION PLAN STORM WATER ANNUAL REPORT TEMPORARY DRAINAGE INLET PROTECTION TEMPORARY SILT FENCE TEMPORARY CONSTRUCTION ENTRANCE STREET SWEEPING TEMPORARY CONCRETE WASHOUT WATER QUALITY SAMPLING AND ANALYSIS DAY WATER QUALITY MONITORING REPORT WATER QUALITY ANNUAL REPORT TREATED WOOD WASTE TEMPORARY PIN FLAG ESA MARKER CLEARING AND GRUBBING (LS) ROADWAY EXCAVATION ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) (F) - STRUCTURE EXCAVATION (BRIDGE) STRUCTURE EXCAVATION (TYPE COM, AERIALLY DEPOSITED LEAD) (F) - STRUCTURE BACKFILL (BRIDGE) BONDED FIBER MATRIX (SQFT) COMPOST (CY) CLASS 2 AGGREGATE BASE (CY) SAND COVER (SEAL) ASPHALT-RUBBER BINDER ASPHALTIC EMULSION (FOG SEAL COAT) ASPHALTIC EMULSION (FLUSH COAT) CRACK TREATMENT PRECOATED AGGREGATE (SEAL COAT) SEGMENT CORRECTION HOT MIX ASPHALT (TYPE A) RUBBERIZED HOT MIX ASPHALT (GAP GRADED) DATA CORE PLACE HOT MIX ASPHALT DIKE (TYPE C) PLACE HOT MIX ASPHALT DIKE (TYPE E) PLACE HOT MIX ASPHALT DIKE (TYPE F) TACK COAT REMOVE ASPHALT CONCRETE DIKE COLD PLANE ASPHALT CONCRETE PAVEMENT FURNISH 24" CAST-IN-STEEL SHELL CONCRETE PILING DRIVE 24" CAST-IN-STEEL SHELL CONCRETE PILE FURNISH 36" CAST-IN-STEEL SHELL CONCRETE PILING DRIVE 36" CAST-IN-STEEL SHELL CONCRETE PILE (F) - STRUCTURAL CONCRETE, BRIDGE (F) - STRUCTURAL CONCRETE, BRIDGE (POLYMER FIBER) (F) - STRUCTURAL CONCRETE, BRIDGE (SELF-CONSOLIDATING) (F) - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N) (F) - STRUCTURAL CONCRETE, DRAINAGE INLET PIER CAP WITH COLUMN MOCK-UP FURNISH PRECAST PRESTRESSED CONCRETE SLAB (TYPE SIV) FURNISH PRECAST PRESTRESSED CONCRETE SLAB (TYPE SIV MODIFIED) FURNISH PRECAST CONCRETE PIER CAP ERECT PRECAST CONCRETE PIER CAP ERECT PRECAST PRESTRESSED CONCRETE DECK UNIT JOINT SEAL (MR 1 1/2") (F) - BAR REINFORCING STEEL (BRIDGE) (F) - STRUCTURAL STEEL (PIPE PIN) CLEAN AND PAINT STEEL PILING BRIDGE REMOVAL 18" CORRUGATED STEEL PIPE (.079" THICK) 6" WELDED STEEL PIPE CASING (BRIDGE) 18" STEEL FLARED END SECTION REMOVE DOWNDRAIN (EA) REMOVE FLARED END SECTION (EA) ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (CY) ROCK SLOPE PROTECTION FABRIC (CLASS 8) (F) - MISCELLANEOUS IRON AND STEEL ADJUST MONUMENT COVER TO GRADE REMOVE PAVEMENT MARKER PAVEMENT MARKER (RETROREFLECTIVE) OBJECT MARKER (TYPE P) OBJECT MARKER (TYPE R) REMOVE ROADSIDE SIGN (WOOD POST) RESET ROADSIDE SIGN (ONE POST) RESET ROADSIDE SIGN (TWO POST) FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-UNFRAMED) FURNISH SINGLE SHEET ALUMINUM SIGN (0.080"-UNFRAMED) ROADSIDE SIGN - ONE POST MIDWEST GUARDRAIL SYSTEM (STEEL POST) VEGETATION CONTROL (MINOR CONCRETE) (F) - TUBULAR BICYCLE RAILING TRANSITION RAILING (TYPE WB-31) ALTERNATIVE IN-LINE TERMINAL SYSTEM (TL-3) ALTERNATIVE CRASH CUSHION TL-3 (F) - CALIFORNIA ST-75 BRIDGE RAIL (MODIFIED) REMOVE GUARDRAIL THERMOPLASTIC PAVEMENT MARKING (ENHANCED WET NIGHT VISIBILITY) 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 6-1) 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 12-3) 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 17-7) 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 36-12) 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) 8" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) 12" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) REMOVE THERMOPLASTIC TRAFFIC STRIPE REMOVE THERMOPLASTIC PAVEMENT MARKING 12" RUMBLE STRIP (ASPHALT CONCRETE PAVEMENT) 6" TRAFFIC STRIPE TAPE (WARRANTY) 6" TRAFFIC STRIPE TAPE (WARRANTY) (BROKEN 36-12) MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION TRAFFIC MONITORING STATION SYSTEM MOBILIZATION Steelhead will work with suppliers and subcontractors to identify opportunities and break down items into economically feasible units.


PROJECT NAME:

Construction on State Highway in Fresno and Kings Counties at Various Locations

BID CONTRACT #:

06-0V1104

AWARDING AGENCY:

Caltrans

PROJECT LOCATION:

District-County-Route-Post Mile: 06-Fre,Kin-5, 41, 198-Var, Fresno, CA, 93727

BID DUE DATE:

07-06-2023 at 02:00 PM

OUTREACH COORDINATOR:

Kelly Knight

TELEPHONE:

5302266400

FAX:

5302266401

ADDRESS:

2940 Innsbruck Drive, Redding, CA, 96003

PROJECT DETAILS:

Steelhead Constructors JV (Steelhead) will be bidding the referenced project as a prime contractor. Plans and specifications for this project may be viewed at the Caltrans Website where you Opted-In, at your local builder’s exchange and are available for review in our office. If you require additional information regarding the requirements of the contract, please don’t hesitate to call our office. In order that we may give your bid maximum consideration, please supply us with an email prior to the bid date describing the scope of your work.

Steelhead is an Equal Employment Opportunity Employer. We encourage and actively solicit proposals from DVBE, DBE, MBE, WBE, DBE and MB subcontractors and suppliers on all our projects. All qualified DVBE, DBE, MBE, WBE, and MB subcontractors must be registered and certified by the California Department of Transportation. Steelhead is signatory to Operating Engineers, Laborers, Carpenters and Cement Masons Unions. All subcontractors must possess a current contractor’s license, insurance, and workers’ compensation coverage meeting Steelhead’s requirements and will be required to sign Steelhead’s Subcontract Agreement. Performance and payment bonds up to 100% may be required for the full amount of the subcontract price. Prior to the bid, upon request, you can contact our office if you require assistance in bonding, lines of credit, insurance, obtaining necessary equipment, supplies, materials or services, establishing delivery schedules, etc., which may be required by the Owner. Please contact our office and advise us if you are interested in this project. When submitting any bid on a public works project, please prominently include, on your quote, your California Contractors License Number and Department of Industrial Relations Number. More information regarding California Contractors License and DIR Numbers can be found at http://www.cslb.ca.gov/  and http://www.dir.ca.gov/Public-Works/PublicWorks.html.

Sincerely,

STEELHEAD CONSTRUCTORS JV

Kelly Knight

The Estimating Department 530-226-6400 ask for Kelly Knight. Please email quotes to estimating@steelheadconstructors.com

Have any questions?

Send us your message and we'll get back to you within one business day at the very latest.

Social Media

Copyright © 2024 Compliance News All rights reserved.