is seeking certified and qualified DBE subcontractors and/or suppliers to provide AC DIKE, ADJUST MANHOLES / VALVES, AGGREGATE BASE, CATCH BASINS, CHAIN LINK FENCE, CLEARING & GRUBBING, COLD MILLING, CONCRETE STRUCTURES & REBAR, CONCRETE, CONSTRUCTION AREA SIGNS, ELECTRICAL, EROSION CONTROL, GRINDING, GUARD RAIL, LANDSCAPE / IRRIGATION, LOOPS, MINOR CONCRETE STRUCTURE, PAINT/STAIN CONCRETE, ROCK BLANKET, SAWCUT, SIGNS, STORM DRAIN, STREETLIGHTS, STRIPE/MARK, SURVEY/SURVEY MONUMENTS, SWPPP, THERMOPLASTIC TRAFFIC STRIPING, TRAFFIC CONTROL, MATERIALS, RENTAL EQUIPMENT, TRUCKING
CONSTRUCTION ON STATE HIGHWAY ROUTE 2 IN LOS ANGELES COUNTY IN LOS ANGELES AT VARIOUS LOCATIONS FROM CENTINELA AVENUE TO GLENDALE BOULEVARD UNDERCROSSING
CONTRACT NO. 07-333604, 07-LA-2-2.3/14.2 PROJECT ID 0716000313 FEDERAL-AID PROJECT: P002(043)E
CALTRANS
ROUTE 2 IN LOS ANGELES AT VARIOUS LOCATIONS, LOS ANGELES, CA, 90025
04-13-2023 at 02:00 PM
Jessica Daniels
17145789600
714-578-9672
135 S STATE COLLEGE BLVD STE 400, Brea, CA, 92821
PROJECT DETAILS:
An Equal Opportunity Employer
License No. 747612-A
DIR Registration No. 1000003664
135 S. State College Blvd., Suite 400, Brea, CA 92821
Phone: (714) 578-9600 FAX: (714) 578-9672
Contact: Estimating Department
Plans, Specifications and Project Requirements are available for viewing on the Sully-Miller Website: www.sully-millerplans.com, or the CALTRANS website at www.dot.ca.gov/hq/esc/oe/weekly_ads/adv_priorweek.
Sully-Miller is willing to set aside any portion of work, no matter how small to encourage (DBE PARTICIPATION-21%) participation. If you require information regarding assistance in obtaining bonding, insurance, credit, equipment, supplies, materials, or related services, please call our office.
100% Payment and Performance Bonds May Be Required
PDF ATTACHMENTS: