is seeking certified and qualified DBE subcontractors and/or suppliers to provide Granite Construction Company is seeking DBE Subs/Suppliers for participation on this project. All items of work are available, including (but not limited to) the following suggested items: Lead Compliance Plan; SWPP Plan; Rain Event Action Plan; Storm Water Sample/Analysis and Annual Report; Construction Area Signs; Traffic Control/Flagging; Traffic Control Devices, including Attenuator Vehicle, Barricades, Traffic Drums, PCMS boards, Radar Speed Feedback devices, End of Queue Signs, Crash Cushions, Automated Flagger Assist; Temporary K Railing; Treated Wood Waste; Temporary Fencing; Clear & Grub/Tree Removal; Prune Existing Plants; Planting & Irrigation; Compost; Incorporate Materials; Foliage & Root Protectors; Rolled Erosion Control; Hydroseeding; Erosion Control items; Bonded Fiber Matrix; Fiber Rolls; Gravel Bag Berm; Sediment Barrier; Geotextile Subgrade Enhancement; Rock Blanket; Shoulder Backing; Lean Concrete Base; Asphalt Crack Treatment; Data Coring; HMA Dike; Pave Misc Area; Tack Coat; Cold Plane/Grinding; Continuously Reinforced Concrete Pavement; Isolation Joint Seal; Steel Casing; Jacked Steel Casing; Furnish/Drive All Piling items; Structural Concrete items; Concrete Surface Texture; Bar Reinforcing Steel; Masonry Block Sound Wall; Bridge Deck Treatment; Bridge Removal; Pipe materials; Underground installation; Concrete slope paving; Rock Slope Protection; RSP Fabric; Minor Concrete items, incl. Vegetation Control; Textured Paving; Misc Iron & Steel; Prepare & Stain Concrete; Stucco Finish; Destroy Well; Fencing & Gate items; All Roadside sign items, incl. Removals and Post items; Markers & Delineators; High Tension Cable Barrier; Guardrail System; Bicycle Railing; Concrete Barrier items incl. Rebar; All Striping & Marking incl. Removals; Rumble Strip (AC & Concrete); All Electrical work; Equipment Rental/Mobilization; Trucking; Asphalt Oil Supply/Delivery; Street Sweeping; Jobsite Sanitation Rental. Please contact our office if there are additional items, or portions of items, your firm is interested in bidding. Granite Construction will break down items of work to facilitate DBE participation on this project. All non-DBE subcontractors are also encouraged to utilize DBE suppliers for their work, where possible. Call Patricia Arnett with Granite, at (831) 763-6100 if you need help locating a DBE supplier. Please include any DBE participation information with your quote.
Hwy 156 Widening, San Juan Bautista (San Benito County)
05-344904
Caltrans - Contract 05-34404
Hwy 156 near San Juan Bautista (San Benito County) - from The Alameda to .2 mile east of Fourth Street/Route 156, near San Juan Bautista, CA, 95045
03-02-2022 at 02:00 PM
Patricia Arnett
Not Available
831-761-1042
580 West Beach Street, Watsonville, CA, 95077
PROJECT DETAILS:
PLANS:
Plans and Specifications can be downloaded from the Caltrans Office Engineer project website:
http://ppmoe.dot.ca.gov/des/oe/weekly-ads/oe-project.php?q=05-344904
DBE firms are encouraged to use the "Opt-in" link on the project website to leave your company information.
If this is your first time downloading plans from Caltrans, you will need to register with a Caltrans Connect account, using the following link:
http://www.dot.ca.gov/des/oe/connect/oe-register.php
After doing so, please go to the project page above to download plans. Prior to download, you will also need to agree to their Non-Disclosure terms. Please call or email Patricia Arnett at (831) 763-6100 or patricia.arnett@gcinc.com if you need any assistance in locating or downloading plans for this project, or if you need assistance in obtaining bonding, insurance, equipment, materials and/or supplies. Granite intends to work cooperatively with all qualified DBE firms seeking work on this project. Granite is an equal opportunity employer.
REQUIREMENTS:
Granite Construction Company is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons and Carpenters unions.
100% performance and payment bonds may be required for the full amount of subcontract price. Granite Construction will assist with bonding costs for subcontractors. The US Small Business Administration may also assist you in obtaining bonding - please see the following site for information: http://www.sba.gov/content/contractors#
Subcontractors must possess a current contractor’s license and current DIR number. All quotes are subject to the terms of Granite Construction Company’s applicable standard form agreement which is available through the following link: https://www.graniteconstruction.com/ca-resources/quote-solicitation