Conan Construction, Inc.

is seeking certified and qualified City of San Diego SLBE/ELBE and DVBE subcontractors and/or suppliers to provide Survey, SWPPP, General & Final Cleanup, Temp Facilities (trailers, toilets, temp fencing, etc.), dust control, Demo, Abate, Grading, Concrete, Steel, Misc. Metals, Waterproofing, Rough Carpentry, Metal Studs, Drywall and Plaster, Roofing, Sheet Metal/Roof Hatch, Doors, Frames, Hardware, Storefront, Painting, Lay-in Ceilings, Flooring, Ceramic Tile, Casework, Misc. Specialty, Finish Carpentry


PROJECT NAME:

Mountain Empire Jr. High School Site Modernization Project

BID CONTRACT #:

Not Available

AWARDING AGENCY:

Mountain Empire Unified School District

PROJECT LOCATION:

3291 Buckman Springs Road, Pine Valley, CA, 91962

BID DUE DATE:

12-20-2022 at 02:00 PM

OUTREACH COORDINATOR:

Bree

TELEPHONE:

7605121188

FAX:

NA

ADDRESS:

2870 Whiptail Loop East Suite 225, Carlsbad, CA, 92010

PROJECT DETAILS:

BID INVITE

Mountain Empire Jr. High School Site Modernization Project

BIDS DUE:

December 20th, 2022 @ 2:00 PM

 

Pre-Bid Walk: December 8, 2022 @ 9:00 AM

 

Please respond with email:

YES – We will be bidding

NO – We will not be bidding

 

Project Name: Mountain Empire Jr. High School Site Modernization Project

Project Address: 3291 Buckman Springs Road, Pine Valley, CA 91962

Owner/District: Mountain Empire Unified School District

Architect: Davy Architect

 

 

DVBE, WBE, MBE, DBE and SB Subcontractors & Suppliers are encouraged to bid.

All Contractors and Subcontractors must be registered with the Department of Industrial Relations (DIR) at Bid Time.  Prevailing Wage Project.

 

PROJECT DESCRIPTION:

The Project consists of the Modernization of Wood Frame Building C (13,606 SF), Portable Building P101 (1,333 SF), Portable Building P102 (936 SF), Portable Building P104 (865 SF), Removal of Portable Building P103 off site, New Construction of a Wood Frame Bookroom Building (662 SF), Building A New Entry Feature Additive Alternate, and Various Site Improvements and Site Utilities. District Budget for this work is $8.2 Million.  The anticipated schedule is approximately 9 months (anticipated start 1-11-23). Phase 1 (All Buildings and associated Site-work except P103 and P104) must be complete by Mid July 2023. Phase 2 (P103, P104 and Jr. HS Courtyard work) will start in June 2023 and must be compete in October 2023.

 

Trades involved include but not limited to:

BP-01

Survey, SWPPP, General & Final Cleanup, Temp Facilities (trailers, toilets, temp fencing, etc.), dust control

BP-02

Demo, Abate, Grading, Concrete, Steel, Misc. Metals, Waterproofing, Rough Carpentry

BP-03

Metal Studs, Drywall and Plaster, Roofing, Sheet Metal/Roof Hatch, Doors, Frames, Hardware, Storefront, Painting, Lay-in Ceilings, Flooring, Ceramic Tile, Casework, Misc. Specialty, Finish Carpentry

 

PLEASE SUBMIT BIDS TO:

Shannon Maurer: 760-707-2520 / estimating@conanconstruction.com

Thank you in advance for participating in this project

 

*If you are not interested in bidding this project, please disregard this notification and any further corresponded for this project*

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News Rss Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.