is seeking certified and qualified City of San Diego SLBE/ELBE, DBE, DVBE, SBE and WBE subcontractors and/or suppliers to provide Demolition, Concrete Reinforcing, Cast in place concrete, concrete finishing, rough carpentry, wood casework, damp proofing and waterproofing, sheet waterproofing, insulation, metal roof, wall panels, thermoplastic membrane roofing, sheet metal and flashing, joint sealants, hollow metal doors and frames, wood doors, access doors and frames, glazed aluminum storefront, door hardware, door hardware cuts, glazing, cement plastering, gypsum board, tiling, acoustical ceilings, linear wood ceilings, acoustical wall treatment, painting and coating, visual display board, signage, wall surface protection, signage, wall surface protection, toilet accessories, metal lockers, food service equipment, projection screens, specialty music education performance, plumbing, hvac, electrical, communications, intrusion detection, fire alarm and fire detection, asphalt paving, chain link fence and gates, ornamental metal fences and gates, site utilities.
Santana High School Building 600 Modernization
CN 2849
Grossmont Union High School District
9915 Magnolia Avenue, Santee, CA, 92071
02-22-2022 at 02:00 PM
Bree
Not Available
NA
5937 Darwin Court, Suite 103, Carlsbad, CA, 92008
PROJECT DETAILS:
Project Name: Santana High School Building 600 Modernization
Project Address: 9915 Magnolia Avenue, Santee, CA 92071
Owner/District: Grossmont Union High School District
Architect: HED
DVBE Subcontractors & Suppliers are encouraged to bid.
All Contractors and Subcontractors must be registered with the Department of Industrial Relations (DIR) at Bid Time. Prevailing Wage Project.
PROJECT DESCRIPTION:
Building 600 Modernization, new boiler temporary kitchen installation and Adult Education modular building removal will include campus egress upgrade.