Edwards Construction Group

is seeking certified and qualified DVBE subcontractors and/or suppliers to provide Concrete, Demolition, Structural Steel, Steel Framing, Steel Decking, Architectural Casework, Insulation, Roofing, Sheet Metal, Doors and Frames, Glass and Glazing, Overhead Doors, Drywall, Plaster, Flooring, Acoustical Ceilings, Painting, Signage, Window Shades, Fire Protection, Plumbing, HVAC, Electrical, Communications, Fire Alarm, Asphalt Paving, Utilities, Earthwork, Fencing, and Landscaping


PROJECT NAME:

Santa Barbara High School Visual Arts & Design Academy (Re-Bid)

BID CONTRACT #:

02-22/23

AWARDING AGENCY:

Santa Barbara Unified School District

PROJECT LOCATION:

700 E. Anapamu St., Santa Barbara, CA, 93103

BID DUE DATE:

10-20-2022 at 02:00 PM

OUTREACH COORDINATOR:

Brad Edwards

TELEPHONE:

805-335-1161

FAX:

805-614-9909

ADDRESS:

PO Box 350, Nipomo, CA, 93444

PROJECT DETAILS:

Scope: 

The project includes the construction of a new, single story art and media classroom building, and associated hardscape and landscape site work. All work to be completed to industry standards and best practices. Further details available in specs. 

Plans are available electronically from be@edwardscongroup.com. All bids and material quotes must be per plans and specifications. All bids are required to be received in our office through our e-mail or fax number at least 1-2 business days before Bid Due Date so that we have ample time to fill out the required bid forms for the owner. Edwards Construction Group, Inc. is an Equal Opportunity Employer. Bonds may be required and subcontractor must agree to our subcontract agreement.

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News Rss Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.