is seeking certified and qualified DVBE subcontractors and/or suppliers to provide List of Trades Required - • Bid Package #003 Demolition & Abatement • Bid Package #007 Survey & Staking • Bid Package #008 Earthwork, Utilities, Paving & Striping • Bid Package #012 SWPPP • Bid Package #016 Landscape & Irrigation • Bid Package #023 Fencing & Gates • Bid Package #030 Site & Building Concrete • Bid Package #031 Masonry • Bid Package #040 Caulking & Sealants • Bid Package #044 Acoustic & Thermal Insulation • Bid Package #052 Glass & Glazing • Bid Package #054 Specialty Doors • Bid Package #056 Door, Frames & Hardware • Bid Package #059 Casework & Finish Carpentry • Bid Package #060 Framing & Drywall • Bid Package #061 Painting • Bid Package #062 Acoustical Ceiling • Bid Package #065 Carpet & Resilient Flooring • Bid Package #066 Fluid Applied Flooring and Sealed Concrete • Bid Package #070 Final Clean • Bid Package #072 Building Signage • Bid Package #074 Bathroom Accessories • Bid Package #075 Building Specialties • Bid Package #076 FRL/FRP • Bid Package #077 Lockers • Bid Package #078 Flagpoles • Bid Package #082 Window Covering • Bid Package #085 Food Service Equipment • Bid Package #098 Plumbing • Bid Package #100 HVAC & Control Systems • Bid Package #102 Testing & Balancing
Woodland Fire Station #4
Not Available
CORE Construction
1585 East Gibson Road, Woodland, CA, 95776
12-03-2026 at 12:00 PM
Cristian Rivera
530-883-8250
Not Available
1410 Rocky Ridge Dr Suit 180, Roseville, CA, 95661
PROJECT DETAILS:
Request for Proposal
CORE Construction along with the City of Woodland requests proposals from licensed subcontractors for the following Progressive Design Build project:
Woodland Fire Station #4
City of Woodland
1585 East Gibson Road
Woodland, CA 95776
Scheduled bidding period 11/02/2026 – 12/03/2026
Project Description -
The City of Woodland Fire Station #4 project, delivered through progressive design build, comprises of an approximately 7,000 square foot, 3-bay fire station with attached dorm, living, and administrative spaces on approximately 1-acre of developed site along Bourn Dr. The building structure is a pre-engineered metal building, enclosed with a metal roof, metal exterior panels, glazing, and potentially additional exterior finishes (dependent on bid alternatives). Interior construction will comprise of standard building materials associated with a type V-B building including but not limited to: light gauge metal studs, drywall, suspended acoustical ceilings, carpet tile, LVT, sealed concrete, paint finishes, insulation, sealants, doors, frames, hardware, built-in casework, as well as standard fire station specialties and equipment. Building systems include fire suppression, plumbing, HVAC, as well as electrical and low voltage systems. Specialty systems including vehicle exhaust systems, emergency power generation, and overhead coiling doors are included as well.
Please note that the following packages have already been bid as part of an early package; Pre-Engineered Metal Buildings, Fire Suppression and Electrical/Low Voltage.
To become prequalified with CORE Construction, or to update your current qualifications, please fill out the online application request by visiting: https://www.coreconstruction.com/subcontractors/ then select “California”.
For project questions and to be added to building connected please email cristianrivera@coreconstruction.com
For prequalification questions, please email katiekaisner@coreconstruction.com
The project is subject to prevailing wage rate requirements, a 3% DVBE goal, Skilled and Trained workforce requirements apply. CORE Construction is an equal opportunity employer.