De La Fuente Construction Inc.

is seeking certified and qualified DVBE subcontractors and/or suppliers to provide De La Fuente Construction Inc, is seeking certified and qualified DVBE subcontractors and/or suppliers to provide services for the trades to include Site Preparation, Site Clearing, Selective Demolition, Earthwork, Excavation, Soil Preparation, Concrete, Concrete Reinforcing, Concrete Paving, Asphalt Paving, Storm Drainage, Underground Utilities, Electrical, Low Voltage, Voice/Data Communications, Video Surveillance, Metal Railings, Chain Link Fencing and Gates, Pavement Striping, Joint Sealants, Tactile Warning Surfacing, Parking Bumpers, Signage, Athletic Equipment, Bleachers, and Athletic Field Sand.


PROJECT NAME:

Castle Park High School Parking Lot Rehabilitation

BID CONTRACT #:

Bid 26-2980-AM / DSA #04-124834

AWARDING AGENCY:

Sweetwater Union High School District

PROJECT LOCATION:

1395 Hilltop Dr, Chula Vista, CA, 91911

BID DUE DATE:

11-03-2026 at 10:00 AM

OUTREACH COORDINATOR:

Hector Ojeda

TELEPHONE:

619-512-5505

FAX:

619-878-2980

ADDRESS:

3025 Beyer Blvd Suite E-101, San Diego , CA, 92154

PROJECT DETAILS:

Project Scope: The project consists of: Replacement of asphalt paving in the existing student parking lot and the basketball hardcourt areas. Work includes over-excavation and recompaction of soils, new parking lot layout, striping, speed bumps, signage, concrete islands and sidewalks, concrete wheel stops, lighting, and security cameras. The work will be completed in 3 phases, refer to project documents for additional information.

Interested DVBE subcontractors and suppliers are encouraged to review the project plans, specifications, and applicable addenda and submit proposals for their respective trades. All subcontractors must possess the appropriate CSLB license, maintain active DIR registration where applicable, and comply with California prevailing wage requirements and applicable project requirements.

Please include all applicable labor, materials, equipment, delivery, insurance, bonding (if required), and other costs in your proposal. Identify all exclusions, qualifications, and proposed substitutions. Early submissions are encouraged to allow sufficient time for review and coordination prior to the District's bid deadline.

De La Fuente Construction, Inc. is committed to providing qualified DVBE businesses with an opportunity to participate in this project.

-Plans & specs are available at no cost to interested DVBE firms to view and download please request link by e-mail us at estimating@dlfci.com

-Assistance is available from the bidder for DVBE subcontractors/vendors in obtaining necessary equipment, supplies and materials. 

-Assistance is available for DVBE firms in obtaining bonding, lines of credit or insurance

 

 

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News Rss Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.