is seeking certified and qualified DBE and SBE subcontractors and/or suppliers to provide all bid items, particularly these: Crack Monitoring / Vibration Monitoring, Staking / Survey, Lead Compliance Plan, Signs, Traffic Control / Traffic Control Devices, Striping & Markings, SWPPP / Inspections / Reporting, Erosion Control – Temporary & Permanent, Tack Coat / Prime Coat / Geosynthetic Pavement Interlayer, Asphalt Dike, Cold Plane / Smoothness (Diamond) Grinding / Inertial Profiler, Rapid Set Concrete Replacement / Spall Repair / Deck Grinding, Soil Nails, Fractured Fin Formliner, CIDH, Reinforcing Steel (Rebar), Shotcrete, Sign Structures, Underground – Storm / Sewer / Water, Minor Concrete, Electrical, Painting, Fencing, MGS / AITS / TBB / Veg. Control / Cable Railing, Concrete Barrier, Rumble Strip, Trucking, ADL Trucking & Disposal, and Quality Control
US 101 Express Lanes, Phase 5
Contract No. C26031F
Santa Clara Valley Transportation Authority (VTA)
San Jose to Mountain View, CA, CA, 95138
11-12-2026 at 02:00 PM
Erik Cushman, David Kennedy
408-574-1400
408-365-9548
5225 Hellyer Avenue, Suite 220, San Jose, CA, 95138
PROJECT DETAILS:
** This project will span nearly 4 seasons beginning in Spring 2027 through Winter 2030. Please be sure to include all necessary taxes and escalators in your pricing based upon when your work will be performed. Please see the Stage Construction & Traffic Handling Plans for sequence of work to assist with proper application of taxes and escalators, or contact us to discuss. By submitting a quote, your firm acknowledges this construction timeframe and has included all necessary taxes and escalators for the entire duration stated above, regardless of language within your quote stating otherwise.**
Plans and Specifications are available in our Estimating Office located at 5225 Hellyer Avenue, Suite #220, San Jose, CA 95138. Graniterock is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons and Carpenters unions. 100% payment and 100% performance bonds in the amount of the subcontractors bid will be required from a qualified surety company. Bonding assistance is available. Graniterock will pay bond premium up to 1.5%. In addition to bonding assistance, subcontractors are encouraged to contact Graniterock Estimating with questions regarding obtaining lines of credit, insurance, equipment, materials and/or supplies, or with any questions you may have. Subcontractors will be required to enter into our standard contract. Subcontractors must possess a current contractor’s license, DIR number, insurance and worker’s compensation coverage. Graniterock will break down items of work to facilitate DBE & SBE firms participation.
**PLEASE NOTE – All DBE subcontractors used on this project are required to be certified through the CUCP DBE Database:**
DBE Search: https://caltrans.dbesystem.com