Erickson-Hall Construction Co

is seeking certified and qualified DVBE subcontractors and/or suppliers to provide BIDS FOR THE IMPERIAL VALLEY COLLEGE M&O FACILITY INCREMENT 02 F.E. STORAGE & BURN TOWER Scope of work to include: Increment 02 work will be the construction of new buildings and yard for the M&O facilities. Subcontractor trades include Survey, Concrete, Rebar, Polished Concrete, Masonry, Pre-Engineered Steel Bldg Erection, Steel, Metal Deck, Steel Railings, Casework, Metal Casework, Insulation, Sheet Metal, Doors & Frames, Overhead Coiling Doors, Aluminum Storefront Glazing, Metal Studs, Gypsum Board, Tile, Acoustic Ceilings, Sound Absorptive Panels, Flooring, Painting, Markerboards, Signage, Toilet Accessories, Lockers, Vehicle Exhaust System, Vehicle Lift Installation, Vertical Wheelchair Lifts, Window Blinds, Erection of Pre-Engineered Buildings, Fire Sprinklers, Site Utilities, Plumbing, HVAC, Electrical, Asphalt Paving, Striping, Fencing, Landscape, & Final Cleaning.


PROJECT NAME:

Imperial Valley College M&O Facility Inc. 2 F.E. Storage & Burn Tower

BID CONTRACT #:

Not Available

AWARDING AGENCY:

Erickson-Hall Construction Co.

PROJECT LOCATION:

380 Aten Road, Imperial, CA, 92251

BID DUE DATE:

10-29-2026 at 02:00 PM

OUTREACH COORDINATOR:

Summer Lumpkin

TELEPHONE:

760-796-7700

FAX:

Not Available

ADDRESS:

500 Corporate Drive, Escondido, CA, 92029

PROJECT DETAILS:

Job Walk Date: Wednesday 10/14/2026 at 10:00AM, meet at the north end of the Football Practice Field.

RFI’s due: 10/19/2026 by end of day

Bid Date: 10/29/2026 @ 2:00PM

Lead Estimator: Chris Bartok, cbartok@ericksonhall.com

Project Address: 380 Aten Road, Imperial CA 92251

Bid Documents can be obtained by contacting planroom@ericksonhall.com, all bids are to be submitted via Building Connected.

Project requires Prevailing Wage and Owner Controlled Insurance Program (OCIP)

If you are planning to bid this project, we encourage your participation and welcome your bid.  All qualified bidders will receive consideration without regard to race, color, religion, sex or national origin.  Erickson-Hall Construction Company requires all subcontractors submitting bids in excess of $100,000 to be prepared to furnish performance and payment bonds issued by a corporate security.  Erickson-Hall Construction Company, at its sole discretion, reserves the right to waive this requirement or permit substitute security or alternate guarantees. We offer assistance in obtaining necessary equipment, supplies materials, bonds, lines of credit and insurance.

Erickson-Hall Construction provides notice to all contractors of the adoption of SB 854, this requires subcontractors to comply with the requirements as set forth on the Department of Industrial Relations (DIR) website at http://www.dir.ca.gov/Public-Works/publicworks.html.  SB 854 requires all contractors who perform public works projects must be registered with the Department of Industrial Relations. No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after, unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5).

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News Rss Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.