Conan Construction, Inc.

is seeking certified and qualified DVBE subcontractors and/or suppliers to provide Demolition / Sawcutting / Excavation Concrete / Cast-in-Place Concrete / Equipment Pads & Foundations Structural Steel / Miscellaneous Metals / Metal Fabrications Vehicle Lift Installation / Automotive Equipment Electrical — power, conduit, conductors, grounding, transformers, panelboards, disconnects, commissioning Plumbing Asphalt Paving Site Concrete Painting – Interior & Exterior High-Performance Coatings Fluid-Applied Flooring / Floor Preparation Joint Sealants Hollow Metal Doors & Frames Overhead Coiling Doors Door Hardware Security Systems Vehicle Charging Equipment / EV Charging Signage Fire Protection Specialties Earthwork / Drilled Concrete Piers & Shafts Temporary Fencing / Barricades / Dust Control Construction Cleaning / Waste Hauling


PROJECT NAME:

CUYAMACA COLLEGE AUTO LIFTS REPLACEMENT

BID CONTRACT #:

B26.014

AWARDING AGENCY:

Grossmont–Cuyamaca Community College District

PROJECT LOCATION:

900 Rancho San Diego Parkway,, El Cajon, CA, 92019

BID DUE DATE:

10-08-2026 at 02:00 PM

OUTREACH COORDINATOR:

Bree

TELEPHONE:

7605121188

FAX:

NA

ADDRESS:

2870 Whiptail Loop East, Suite 225, Carlsbad, CA, 92010

PROJECT DETAILS:

Conan Construction is soliciting subcontractor and supplier proposals for the Cuyamaca College Auto Lifts Replacement – B26.014 project for Grossmont-Cuyamaca Community College District.

The project generally consists of the phased renovation of the existing automotive technology facility and replacement/installation of vehicle lifts, including demolition and excavation; concrete and structural modifications; installation and anchorage of Owner-Furnished/Contractor-Installed (OFCI) vehicle lifts; electrical power and distribution modifications; plumbing modifications; architectural improvements; doors and hardware; flooring and coatings; interior and exterior painting; site improvements; paving; security system work; vehicle charging equipment; testing, commissioning, and all associated work necessary to provide complete and operational vehicle lift systems.

Work will be performed in phases within an active college facility and includes temporary barriers, dust control, protection of existing equipment, coordination around occupied classrooms, utility shutdown coordination, inspections, testing, commissioning, punch list, and final restoration.