Reyes Construction Inc

is seeking certified and qualified SBE subcontractors and/or suppliers to provide Subcontractors- Divers, Electrical, Sawcutting and Core Drilling, Demolition, EPS Foam, AC Paving, Surveying, QAQC, Reinforcing Steel, Trucking, SWPPP, Abatement, Video Documentation, Chlorination, Painting and Coatings, Signage and Striping, Environmental/Bio Monitoring, Asphalt Cold Milling Demo, Welder- Field, Drilling-High Mast Light Post Foundation Suppliers- Fiberglass Pile Repair Jackets, Waterworks Supply, Aggregates, Ready Mixed Concrete, Misc. Metals, Geotextile, Precast Vaults, Bollard-100MT T-Head, Treated Timber-Bull Rail, Pier Fender, Asphalt, BMP Materials, Stormwater Bioretention System, Neoplast HP Weir Structure, Anchor Bolts


PROJECT NAME:

Structural Repairs at NCMT Berths 24-3 & 24-4

BID CONTRACT #:

2025-21

AWARDING AGENCY:

Port of San Diego

PROJECT LOCATION:

National City Marine Terminal, National City, CA

BID DUE DATE:

11-04-2026 at 10:00 AM

OUTREACH COORDINATOR:

Brenda Martinez

TELEPHONE:

909-622-2259

FAX:

Not Available

ADDRESS:

1383 South Signal Dr., Pomona, CA, 91766

PROJECT DETAILS:

Estimated Project Value: $35.5M

Project Scope:

The Work includes demolition and removal of portions of the existing concrete deck, pile caps, and appurtenances, construction of a new reinforced concrete deck, repair of existing piles, installation of pile jackets, and replacement of waterfront elements, including bull rails, wale systems, fenders, and mooring hardware such as bollards.

The Work also includes installation and replacement of utilities and site improvements, including potable water, stormwater, drainage, pavement replacement, and utility potholing. Additional work includes excavation, backfill, dewatering, demolition, hauling, disposal, and temporary work necessary to complete the Project. The Contractor shall coordinate all work to maintain terminal operations and minimize impacts to tenants and vessel activity.

All Work shall comply with applicable environmental requirements, including in-water work restrictions, turbidity control, monitoring, and seasonal limitations. This Project is partially funded by a federal grant administered by the Maritime Administration (MARAD) and is subject to applicable federal requirements, including Buy America/Build America (BABA) provisions.

 

Assistance will be available in obtaining bonds, lines of credit, insurance, necessary equipment, supplies, materials or related technical assistance.

We will make every effort to establish delivery schedules where the requirement permits.

Reyes Construction, Inc. is signatory to the following unions: Teamsters, Operators, Cement Masons, Carpenters, and Laborers.

For information on the availability of scope of work, plans, and specifications, please contact our office. 

Plans, Specifications, and Contract requirements can be viewed at no additional cost: 

  1. Via BuildingConnected- please send an email request to estimating@reyesconstruction.com
  2. In Person at Reyes Construction Headquarters (please email for appointment)
  3. Sharefile Link- please sened an email request to estimating@reyesconstruction.com 

Please e-mail Questions and Quotes to: Estimating@reyesconstruction.com 

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News Rss Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.