is seeking certified and qualified DVBE and SBE subcontractors and/or suppliers to provide SWPPP MONITORING, SWPPP IMPLEMENTATION, FINAL CLEAN, SURVEY AND LAYOUT, SELECTIVE DEMOLITION, SITE DEMOLITION, ABATEMENT, REINFORCING STEEL, CIP CONCRETE, MASONRY, STRUCTURAL STEEL, METAL DECKING, MISC. METALS, ROUGH CARPENTRY, FINISHED CARPENTRY, CABINETS, MILLWORK , COUNTERTOPS, WATERPROOFING, BUILDING INSULATION, ROOFING, SHEET METAL FLASHING AND TRIM, FIREPROOFING, DOORS FRAMES AND HARDWARE, OVERHEAD COILING DOORS, GLASS, STOREFRONTS, CURTAIN WALLS, GLASS AND GLAZING, DRYWALL AND FRAMING, LATH AND PLASTER, CERAMIC TILE, ACOUSTICAL CEILING AND WALL PANELS, FLOORING, RESINOUS AND EPOXY FLOORING, PAINTING, VISUAL DISPLAY BOARDS, SIGNAGE, TOILET PARTITIONS AND BATHROOM ACCESSORIES, WALL AND DOOR PROTECTION, FIRE EXTINGUISHERS AND CABINETS, METAL LOCKERS, PROJECTION SCREENS, LAB EQUIPMENT, VOCATIONAL SHOP EQUIPMENT, THEATER AND STAGE EQUIPMENT, PLAYFIELD EQUIPMENT AND STRUCTURES, WINDOW COVERINGS, ELEVATORS AND WHEELCHAIR LIFTS, FIRE SPRINKLER, PLUMBING, HVAC CONTROLS WET AND DRY SIDE, ELECTRICAL, COMMUNICATIONS, LOW VOLTAGE, FIRE ALARM, EARTHWORK, AC PAVING AND STRIPING, SITE CONCRETE, FENCES AND GATES, LANDSCAPE AND IRRIGATION, SITE UTILITIES
LAUSD - Palisades Charter High School
10375314/10372564
Los Angeles Unified School District
15777 West Bowdoin St., Pacific Palisades, CA, 90272
11-06-2026 at 02:00 PM
Alicia Daniel
9516781038
9516781083
22710 Palomar Street, Wildomar, CA, 92595
PROJECT DETAILS:
Palisades Charter High School is a Los Angeles Unified School District Jan. 2025 Fire Recovery project at 15777 Bowdoin Street, Pacific Palisades, CA 90272. The combined work includes campus reconstruction, campus-wide HVAC replacement, fencing, and a secure entry system. New construction includes an approximately 56,804-square-foot, two-story classroom building; two one-story academy buildings totaling approximately 4,113 square feet; a team building; and a ticket booth. The project also modernizes existing restrooms, showers, and locker rooms and provides associated ADA improvements.
Athletic and site work includes a regulation baseball field, bleachers, scoreboard, bullpens, batting cages, field lighting, landscape remediation, erosion control, paving, hardscape, drainage, utilities, and campus fencing. Building systems work includes a new chilled-water plant and boiler plant, replacement of HVAC equipment throughout existing campus buildings, temporary classrooms and utilities, new electrical services, photovoltaic and battery energy storage systems, and upgrades to fire alarm, clock, intrusion detection, public-address, communications, and other low-voltage systems. Construction is phased to maintain active campus operations and required interim facilities.
❖ Estimated Cost: $172,907,000 combined contract bond estimate
❖ Project Duration: 1,020 Calendar Days (anticipated December 2026-September 2029)
❖ Liquidated Damages: $5,000/per day
❖ Prevailing wage rates and LAUSD labor compliance monitoring apply
❖ DIR registration and certified weekly payroll compliance are required
❖ Bids must remain valid for a minimum of 60 days
❖ Disabled Veteran Business Enterprise (DBVE) participation goal: 3%
❖ Small Business Enterprise (SBE) participation goal: 25%
❖ Veteran Business Enterprise (VBE) participation goal: 5%
❖ Local worker participation goal: 50%
❖ Project is governed by the Project Stabilization Agreement (PSA) and OCIP
❖ Trade-specific licenses, experience, certifications, and LAUSD prequalification requirements apply
❖ MEP subcontractors must be LAUSD prequalified by 10/30/2026
All subcontractors, including DVBE subcontractors, shall be prepared to provide payment and performance bonds equal to 100% of their subcontract value. ProWest will pay bond premiums up to 1.5%. Please provide your bond rate with your proposal. ProWest reserves the right to require Financial Statements for evaluation and consideration when awarding work to any Subcontractor.
ProWest's listing of a subcontractor does not imply acceptance of any conditions, qualifications, or exceptions stated in the subcontractor's bid proposal. The subcontractor agrees that its bid will remain valid for the same duration as ProWest's bid; must remain valid with the project owner, plus a reasonable time for issuance of a Notice of Intent to Award, Notice to Proceed, or Subcontract. Each listed subcontractor must sign ProWest's standard Subcontract Agreement if ProWest is awarded the project. The Subcontract Agreement is available for review at www.goprowest.com.
This project is subject to the Los Angeles Unified School District Project Stabilization Agreement (PSA), prevailing-wage and labor-compliance requirements, the Owner Controlled Insurance Program (OCIP), and the District's DVBE, SBE, VBE, and local-worker participation programs. By submitting a bid proposal, each subcontractor acknowledges these requirements and agrees to comply with all applicable provisions in the bidding documents, General Conditions and Supplementary Conditions. Mechanical, electrical, and plumbing subcontractors must satisfy LAUSD prequalification requirements by the stated deadline.