Power-Tech Engineers, Inc

is seeking certified and qualified DBE, Los Angeles County LSBE, MBE, WBE and OBE subcontractors and/or suppliers to provide PTEI is seeking qualified DBE/MBE/WBE/OBE subcontractors, suppliers, manufacturers, and service providers interested in participating in this major power-generation modernization project at the Scattergood Generating Station in Los Angeles, California. The project generally includes the modernization of the existing generating facility through the development of a new hydrogen-ready combined-cycle power plant, including combustion turbine generators, steam turbine generators, heat recovery steam generators (HRSGs), cooling systems, fuel gas and hydrogen-ready systems, electrical systems, instrumentation and controls, civil/site improvements, and associated balance-of-plant facilities. NAICS / Construction Categories 236210 – Industrial Building Construction 237110 – Water and Sewer Line and Related Structures Construction 237130 – Power and Communication Line and Related Structures Construction 237990 – Other Heavy and Civil Engineering Construction Potential Subcontracting and Supplier Opportunities Excavation and Earthwork Site Grading and Civil Construction Foundations and Concrete Work Structural Steel Dirt Hauling and Trucking Underground Utilities Mechanical Piping and Pipefitting Valve Installation Fuel Gas Systems Hydrogen-Ready Systems Instrumentation and Controls Installation Welding Rigging and Heavy Hauling Crane Services Traffic Control Stormwater Pollution Prevention / SWPPP Dust Abatement Security Services Construction Cleaning Electrical System Installation MV/HV Electrical Work Low-Voltage and Communication Systems Transmission and Interconnection Work Cooling System Installation Equipment Supply and Fabrication Mechanical Equipment Installation Testing and Commissioning Services Engineering and Specialty Professional Services


PROJECT NAME:

90815R1 Scattergood Generating Station Units 1 & 2 Green Hydrogen-Ready Modernization Project

BID CONTRACT #:

RFP No. 90815R1

AWARDING AGENCY:

Los Angeles Department of Water & Power (LADWP)

PROJECT LOCATION:

685 W Grand Ave, Playa Del Rey, CA, 91789

BID DUE DATE:

09-30-2026 at 02:00 PM

OUTREACH COORDINATOR:

Luis Baque

TELEPHONE:

9095955314

FAX:

9095955394

ADDRESS:

355 S Lemon Ave. Suite A, WALNUT, CA, 91789

PROJECT DETAILS:

Please send your response to Power-Tech Engineers, Inc. (PTEI) at luis.baque@ptei.net no later than September 30, 2026.

Power-Tech Engineers, Inc. (PTEI), a Design-Build/EPC engineering and construction firm, is preparing a proposal for Los Angeles Department of Water and Power (LADWP) RFP No. 90815R1, “Scattergood Generating Station Units 1 & 2 Green Hydrogen-Ready Modernization Project.”

PTEI is seeking qualified DBE/MBE/WBE/OBE subcontractors, suppliers, manufacturers, and service providers interested in participating in this major power-generation modernization project at the Scattergood Generating Station in Los Angeles, California.

The project generally includes the modernization of the existing generating facility through the development of a new hydrogen-ready combined-cycle power plant, including combustion turbine generators, steam turbine generators, heat recovery steam generators (HRSGs), cooling systems, fuel gas and hydrogen-ready systems, electrical systems, instrumentation and controls, civil/site improvements, and associated balance-of-plant facilities.

At this time, PTEI is developing a list of potential suppliers and subcontractors interested in participating in the project. The project will be subject to a Project Labor Agreement (PLA) for applicable on-site construction work.

Companies interested in being included in PTEI's list of potential subcontractors and suppliers should email luis.baque@ptei.net and provide:

  • Brief statement of company qualifications and relevant project experience 
  • Applicable contractor and specialty licenses 
  • DBE, MBE, WBE, OBE, or other applicable certifications 
  • DIR registration information, if applicable 
  • Primary contact information 
  • Description of the goods and/or services the company is interested in providing 

Please include the following statement:

“[Company Name] is interested in the Scattergood Generating Station Units 1 & 2 Green Hydrogen-Ready Modernization Project and would like to be included in PTEI's list of potential subcontractors and suppliers for the project.”

Potential work areas include, but are not limited to:

NAICS / Construction Categories

236210 – Industrial Building Construction
237110 – Water and Sewer Line and Related Structures Construction
237130 – Power and Communication Line and Related Structures Construction
237990 – Other Heavy and Civil Engineering Construction

Potential Subcontracting and Supplier Opportunities

Excavation and Earthwork
Site Grading and Civil Construction
Foundations and Concrete Work
Structural Steel
Dirt Hauling and Trucking
Underground Utilities
Mechanical Piping and Pipefitting
Valve Installation
Fuel Gas Systems
Hydrogen-Ready Systems
Instrumentation and Controls Installation
Welding
Rigging and Heavy Hauling
Crane Services
Traffic Control
Stormwater Pollution Prevention / SWPPP
Dust Abatement
Security Services
Construction Cleaning
Electrical System Installation
MV/HV Electrical Work
Low-Voltage and Communication Systems
Transmission and Interconnection Work
Cooling System Installation
Equipment Supply and Fabrication
Mechanical Equipment Installation
Testing and Commissioning Services
Engineering and Specialty Professional Services

PLANS AND SPECIFICATIONS

Plans and specifications are available at 355 S. Lemon Avenue, Walnut, CA 91789

At this time, PTEI is primarily seeking qualifications and expressions of interest from potential subcontractors and suppliers.

Project documents containing confidential or Critical Energy Infrastructure Information (CEII) may require execution and approval of the applicable LADWP Non-Disclosure Agreement (NDA) before they can be made available.

Applicable contractor license numbers, DIR registration information, and DBE/MBE/WBE/OBE certifications should be provided with responses where applicable.

BID BOND, LINES OF CREDIT, AND INSURANCE

Bonding, insurance, and other financial requirements applicable to individual subcontracting packages will be identified as the procurement packages are developed.

The RFP requires the Design-Builder's proposal to be accompanied by the applicable bid security in accordance with LADWP's RFP requirements. Subcontractors should identify applicable bonding capabilities and bond rates when requested during the bidding process.

PTEI will make reasonable efforts to assist all DBE, MBE, WBE, and OBE subcontractors in obtaining bonds, lines of credit, and/or insurance. If you are interested in participating in this project, please contact Vicki Rojas at vvrojas@ptei.net and at (909) 595-5314.

DISADVANTAGED BUSINESS ENTERPRISE (DBE) / GOOD FAITH EFFORTS (GFE) REQUIREMENTS

The project is subject to Good Faith Effort (GFE) requirements. PTEI invites and encourages certified DBE, MBE, WBE, and OBE firms to participate in the solicitation and bidding process.

PTEI intends to provide opportunities to participate in portions of the work that are economically feasible and consistent with project requirements. Interested firms are encouraged to identify the specific work areas, materials, equipment, or services they are capable of providing.

Where practical, PTEI will consider dividing work into smaller packages, establishing reasonable delivery schedules, and providing assistance related to bonding, lines of credit, and insurance to encourage participation by qualified DBE/MBE/WBE/OBE firms.

PTEI encourages interested firms to respond to this solicitation even if they are unable to perform an entire work package.

EQUAL EMPLOYMENT OPPORTUNITY STATEMENT

Power-Tech Engineers, Inc. is an Equal Opportunity Employer. PTEI and its subcontractors and suppliers shall comply with applicable federal, state, and local equal employment opportunity requirements, including applicable provisions of 41 CFR §§ 60-1.4(a), 60-300.5(a), and 60-741.5(a).

These requirements prohibit discrimination against qualified individuals based on protected status and require covered contractors and subcontractors to take applicable affirmative action in employment.

COMPLIANCE REQUIREMENTS

Companies participating in the project will be required to comply with applicable City of Los Angeles and LADWP contracting requirements, including, as applicable:

Slavery Disclosure Ordinance
Disclosure of Border Wall Contracting Ordinance
Equal Benefits Ordinance
First Source Hiring Ordinance
Executive Directive 35 – Equitable Access to Contracting Opportunities
California Iran Contracting Act of 2010
LADWP Good Faith Effort requirements
Applicable Project Labor Agreement requirements
Applicable LADWP cybersecurity and confidentiality requirements

Thank you in advance for your interest and participation in this project.

 