Nicholas Construction, Inc.

is seeking certified and qualified DBE, MBE, SBA 8(a), SBE, VOSB, WBE and Labor Surplus Area Firms subcontractors and/or suppliers to provide SWPPP, DUST CONTROL, SCHEDULING, SURVEY, TRUCKING, TEMPORARY FACILITIES, TRAFFIC CONTROL, DEMOLITION, POTHOLING, CLEARING AND GRUBBING, TRENCHING, SHORING, EARTHWORK, GRADING, WATERWORKS MATERIALS, SLIDE GATES, AGGREGATE MATERIALS, GENERAL CONCRETE AND FORMWORK, REINFORCING STEEL, WATERWORKS MATERIALS, REINFORCED CONCRETE PIPE, STEEL PIPE, CANAL LINING, MISCELLANEOUS METALS, WELDING, ELECTRICAL AND INSTRUMENTATION, DEEP WELL VERTICAL TURBINE PUMPS, PAINTING AND COATING, PAVING, FENCING, HYDROSTATIC TESTING,


PROJECT NAME:

DRESSER RECHARGE FACILITY, STRUCTURES, AND PIPELINE PROJECT

BID CONTRACT #:

SWID 26-01

AWARDING AGENCY:

Shafter-Wasco Irrigation District

PROJECT LOCATION:

Dresser Ave & Shafter Ave, Wasco, CA, 93263

BID DUE DATE:

09-11-2026 at 02:00 PM

OUTREACH COORDINATOR:

Alex Silicz

TELEPHONE:

661-619-7417

FAX:

Not Available

ADDRESS:

251 Carsen Way, Shafter, CA, 93263

PROJECT DETAILS:

We are an Equal Opportunity Employer. If you are planning to bid this project, we encourage your participation and welcome your bid. All qualified bidders will receive consideration without regard to race, color, religion, sex or national origin. Plans & specifications available by email request to alex@ncidigs.com or andrew@ncidigs.com, or available to view in our office upon request.

The majority of work consists, in general, of earthwork and improvements to the Dresser Recharge Basins and supply channel, installation of new turnouts and conveyance structures, installation of 48" transfer pipeline and 60" steel cased road crossing, and construction of well facility, including piping, electrical and instrumentation, fencing, and associated appurtenances. 

We will assist with Bonds, Lines of Credit, and Insurance, if needed. 

Subcontractors will be required to enter into our standard contract. No modifications to the contract are permitted. All subcontractors/vendors awarded work on this project must be able to furnish subcontract performance and payment bonds, for the amount of the subcontract bid, issued by an admitted corporate surety acceptable to our company (if required).

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News Rss Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.