ProWest Constructors

is seeking certified and qualified DVBE and SBE subcontractors and/or suppliers to provide SWPPP MONITORING, SWPPP IMPLEMENTATION, FINAL CLEAN, SURVEYING, DEMOLITION, HAZARDOUS MATERIAL HANDLING, REINFORCING STEEL, CIP CONCRETE, MASONRY, STRUCTURAL STEEL, METAL DECK, ROUGH CARPENTRY, FINISH CARPENTRY, CABINETS, MILLWORK, COUNTERTOPS, WATERPROOFING, INSULATION, MOISTURE MITIGATION, ROOFING, SHEET METAL FLASHING AND TRIM, METAL SIDING AND COMPOSITE WALL CLADDING, FIREPROOFING, AIR BARRIERS, DOORS, FRAMES AND HARDWARE, OVERHEAD DOORS, SKYLIGHTS, GLASS, STOREFRONTS AND CURTAIN WALLS, DRYWALL AND METAL STUDS, LATH AND PLASTER, CERAMIC TILE, ACOUSTICAL CEILINGS AND WALL PANELS, FLOORING, WOOD FLOORING, PAINTING AND WALL COVERINGS, SPECIALTIES, TOILET ACCESSORIES, SIGNAGE, FIRE EXTINGUISHERS, FOOD SERVICE EQUIPMENT, PROJECTION SCREENS, THEATER AND STAGE EQUIPMENT, PLAYGROUND EQUIPMENT, WINDOW COVERINGS, SITE FURNISHINGS, SOLAR PANEL AAND PHOTOVOLTAIC SYSTEMS, ELEVATORS, FIRE SPRINKLERS, PLUMBING, HVAC, CONTROLS, WET AND DRY SIDE, ELECTRICAL, LOW VOLTAGE, COMMUNICATIONS, FIRE ALARM, EARTHWORK, AC PAVING AND STRIPING, SIRE CONCRETE, UNIT PAVERS, FENCES AND GATES, LANDSCAPE AND IRRIGATION, SITE UTILTIIES


PROJECT NAME:

LAUSD Palisades Charter Elementary School

BID CONTRACT #:

10375313

AWARDING AGENCY:

Los Angeles Unified School District

PROJECT LOCATION:

800 Via De La Paz, Los Angeles, CA, 90272

BID DUE DATE:

10-08-2026 at 02:00 PM

OUTREACH COORDINATOR:

Alicia Daniel

TELEPHONE:

9516781038

FAX:

9516781083

ADDRESS:

22710 Palomar Street, Wildomar, CA, 92595

PROJECT DETAILS:

PROJECT DESCRIPTION:

Palisades Charter Elementary School is a Los Angeles Unified School District project at 800 Via De La Paz, Pacific Palisades, CA 90272. The project involves restoration of existing intact campus buildings and new construction for a campus containing 22 classrooms. New construction includes a one-story classroom building with five TK/Kindergarten classrooms, a two-story classroom building with seven general classrooms, and a one-story multi-purpose building with two specialty classrooms, an MPR, and support spaces.

The work also includes restoration and repair of the existing Main Administration and Cafeteria buildings, including full HVAC and fire alarm replacements. Construction is phased to maintain active campus systems and accommodate partial/beneficial occupancies. Major trade scopes include demolition and hazardous material handling, concrete and masonry, structural steel and metal deck, roofing and building envelope, doors and glazing, interior framing and finishes, specialties and equipment, elevators, fire sprinklers, plumbing, HVAC and controls, electrical, low voltage/communications, fire alarm, earthwork, paving, site concrete, fencing, landscape/irrigation, site utilities, photovoltaic/BESS systems, and related closeout and commissioning work.

Estimated Cost: $68,090,000

Project Duration: 23 Months (699 Calendar Days)

Liquidated Damages: $5,000/Day

Prevailing wage rates and LAUSD labor compliance monitoring apply to this public works project

DIR registration and certified weekly payroll compliance are required

Bids must remain valid for a minimum of 60 days

Disabled Veteran Business Enterprise (DVBE) participation goal: 3%

Small Business Enterprise (SBE) participation goal: 25%

Veteran Business Enterprise (VBE) participation goal: 5%

Compliance with Skilled and Trained Workforce requirements is mandatory

Project is governed by a Project Stabilization Agreement (PSA)

Trade-specific licenses, experience, certifications, and LAUSD prequalification requirements apply

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News Rss Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.