is seeking certified and qualified DVBE subcontractors and/or suppliers to provide 01 23 00 Alternates and Unit Pricing 01 25 00 Substitution Procedures 01 45 29 Construction Observation, Inspection, and Testing 103-22 Listing of Structural Tests & Special Inspections 01 50 00 Temporary Facilities and Controls 01 51 00 Temporary Utilities 01 56 39 Trees and Plant Protection 01 57 13 Erosion Control 01 60 00 Product Requirements 01 70 00 Execution and Closeout Requirements 01 74 19 Construction Waste Management and Disposal 01 78 00 Closeout Submittals 02 41 16 Structure Demolition 03 30 53 Miscellaneous Cast-in-Place Concrete 05 50 00 Metal Fabrications 07 84 13 Penetration Fire Stopping 07 84 46 Fire-resistive Joint Sealants 07 92 00 Joint Sealants 07 92 19 Acoustical Joint Sealants 10 14 00 Signage and Graphics 11 68 33 Athletic Field Equipment 12 93 00 Site Furnishings 31 00 00 Earthwork 31 23 33 Trenching and Backfilling 32 12 00 Asphalt Concrete Paving 32 16 00 Site Concrete 32 17 26 Tactile Warning Surfacing 32 84 00 Planting Irrigation 32 91 13 Soil Preparation 32 92 00 Turf and Grasses 32 93 00 Plants 33 00 00 Utilities 33 40 00 Storm Drainage Utilities 01 45 29 Construction Observation, Inspection, and Testing 103-22 Listing of Structural Tests & Special Inspections 01 50 00 Temporary Facilities and Controls 01 51 00 Temporary Utilities 01 56 39 Temporary Tree and Plant Protection 01 57 13 Erosion Control 01 60 00 Product Requirements 01 70 00 Execution and Closeout Requirements 01 74 19 Construction Waste Management and Disposal 01 78 00 Closeout Submittals 02 41 16 Structure Demolition 03 30 00 Cast-in-Place Concrete 05 50 00 Metal Fabrications 06 10 00 Rough Carpentry 07 26 50 Vapor Emission Control System 07 84 13 Penetration Fire Stopping 07 84 46 Fire-resistive Joint Sealants 07 92 00 Joint Sealants 07 92 19 Acoustical Joint Sealants 08 11 13 Hollow Metal Doors & Frames 08 14 16 Flush Wood Doors 08 31 13 Access Doors 08 71 00 Finish Hardware 09 29 00 Gypsum Board 09 30 00 Ceramic Tile 09 67 00 Urethane Cement Flooring System 09 68 16 Sheet Carpeting 09 91 00 Painting and Finishing 10 14 00 Signage and Graphics 11 68 33 Athletic Field Equipment 12 93 00 Site Furnishings 22 05 10 Basic Plumbing Requirements 22 05 29 Pipe Supports and Anchors 22 05 48 Plumbing Vibration and Seismic Control 22 05 50 Basic Plumbing Materials and Methods 22 05 53 Plumbing Identification 22 05 93 Testing, Adjusting, and Balancing 22 07 19 Plumbing Insulation 22 10 00 Pipes and Pipe Fitting 22 11 00 Plumbing Piping Systems 22 11 13 Pipe Specialties 22 11 19 Valves Piping Specialties 22 40 00 Plumbing Fixtures and Trim 23 05 10 Basic Mechanical Requirements 23 05 29 Supports and Anchors 23 05 50 Basic Mechanical Materials and Methods 23 05 53 Mechanical Identification 23 05 93 Testing, Adjusting, and Balancing 23 07 19 Mechanical Insulation 23 10 00 Pipes and Pipe Fitting 23 11 13 Pipe Specialties 23 23 00 Refrigerant Piping and Specialties 23 31 00 Ductwork 23 33 00 Ductwork Accessories 23 34 00 Fans and Ventilators 23 40 00 Air Filters 23 54 00 Furnaces 23 62 00 Condensing Units 23 70 00 Air Inlets and Outlets 31 00 00 Earthwork 31 23 33 Trenching and Backfilling 32 12 00 Asphalt Concrete Paving 32 12 73 Double Fiberized Micro Surfacing Type I/III 32 15 40 Stabilized DG Paving 32 16 00 Site Concrete 32 17 26 Tactile Warning Surfacing 32 18 13 Synthetic Grass Surfacing 32 18 16.13 Playground Protective Surfacing 32 84 00 Planting Irrigation 32 91 13 Soil Preparation 32 92 00 Turf and Grasses 32 93 00 Plants 33 00 00 Utilities 33 40 00 Storm Drainage Utilities
August Knodt ES and Stella Brockman ES
N/A
Manteca Unified School District
August Knodt Elementary School, 3939 EWS Woods Blvd., Stockton CA 95206 Stella Brockman Elementary School, 763 Silverado Drive, Manteca CA 95336, Stockton/Manteca, CA, 95206
09-29-2026 at 02:00 PM
Harlee Levin
209-838-7388
209-838-3960
1804 Jackson Ave, Escalon, CA, 95320
PROJECT DETAILS:
Bid Date: Tuesday, September 29, 2026 at 2PM
PROJECT DESCRIPTION: LEASE LEASE-BACK PROJECT. SUB BIDS ONLY.
Scope: Extensive site demolition, underground utilities, sitewide electrical and fire alarm upgrades, site concrete, irrigation and landscaping. At Stella Brockman Buildings AE and AG, TK building modernization including added restrooms.
Special Notice to Bidders: Demolition, earthwork, utilities, site concrete, paving and irrigation and landscaping will need to be performed simultaneously on both sites. This includes low voltage upgrades.
Addendum to follow with phasing plan, additional details, and alternates.
Pre-bid Job walk 1: September 8, 2026 at 1:00pm
Location: Stella Brockman Elementary School, 763 Silverado Drive, Manteca CA. Meet in front of school.
Pre-bid Job walk 2: September 9, 2026 at 1:00pm
Location: August Knodt Elementary School, 3939 EWS Woods Blvd. Stockton, CA. Meet in front of school.
Projects to be bid as:
Bid A: August Knodt ES
Bid B: Stella Brockman ES
Total: (Total of both projects)
Project Value: $16M. (Both projects)
Project Duration: August Knodt 12 months, Stella Brockman 9 months
Start Date: November 2, 2026
Plans and Specs can be reviewed at the local Builders Exchanges or on our Website at www.ctbrayton.com under “Bidding”.
Please submit all bid proposals, questions and RFI’s to estimator@ctbrayton.com or fax to 209-838-3960. Bid proposals emailed elsewhere may not be received in time to be considered.
All Bidders must review insurance requirements and include any additional costs in their cost proposals.
MEP Prequalification due to District 10 business days prior to bid date - Any subcontractor work requiring C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43, or C-46 licenses must have current pre-qualified status with the Owner. Bidders must submit the prequalification application to the Owner by the date specified above. Bidders may obtain the prequalification application from the Owners Website.
PLEASE INCLUDE YOUR DIR REGISTRATION NUMBER AND CONFIRM YOU CAN MEET AB-566 / SB-693 SKILLED AND TRAINED WORKFORCE REQUIREMENTS WHEN SUBMITTING BID.
DIR Registration requirements for all Public Works projects (SB854). The requirement to only use registered contractors and subcontractors on public works projects applies to all projects awarded on or after April 1, 2015.
a. All sub-tier subcontractors must be DIR registered contractors at all times during performance of the Work; and
b. Prospective subcontractors may only solicit sub-bids from and contract with lower-tier subcontractors who are DIR registered contractors.
AB-566 / SB-693 Skilled and Trained Workforce Requirements:
All subcontractors of any tier must comply with the requirements set forth in Education Code section 17407.5, including providing an enforceable commitment that all Subcontractors of any tier will use a “Skilled and Trained Workforce” as defined in Public Contract Code 2601(d). All Subcontractors are to carefully review all requirements set forth in Public Contract Code 2600-2603 before bidding the project.
Subcontracts will awarded by the “Best Value Subcontractor Selection” process.
All responsive bidders will be scored according to the following format.
Best Value Subcontractor Selection: The following items will be graded on a point basis as indicated. Higher scores indicate a higher level of compliance in the opinion of the scorer. One scorer will be chosen to represent the Owner, Architect, and C.T. Brayton & Sons, Inc. The Subcontractor with the highest score will be considered the ‘Best Value’ and awarded a Subcontract accordingly.
•15 Points Price
•10 Points Similar Projects (Includes experience with Architect, Owner, GC)
•8 Points Demonstrated ability to meet the Insurance Requirement (COI) and Safety
•7 Points Bonding Capacity
•5 Points Local Business Participation
•5 Points Manpower / Capacity to perform / “Skilled and Trained” workforce compliance
50 Points Maximum Possible Score per Scorer.
All work performed on this project which falls under the recognized jurisdiction of the Carpenter’s Master Agreement for Northern California shall be performed by Union Carpenters.
This project is Prevailing Wage. Seeking DVBE Subcontractor/Supplier Participation.
All subcontractors must be bondable.
Premiums will be paid by C.T. Brayton & Sons, Inc.
EQUAL OPPORTUNITY EMPLOYER
PDF ATTACHMENTS: