is seeking certified and qualified DVBE subcontractors and/or suppliers to provide Site Demolition-Selective Demo, Earthwork-Grading, Storm Drainage and Site Utilities, Site Concrete and Flatwork, Asphalt Paving, Building Concrete-Foundation, SOG, Polished, Post-Installed Anchors, Structural Steel and Metal Fabrications, Rough Carpentry-Wood Framing, Architectural Millwork, Insulation and Air Barrier, Roofing-Metal and BUR, Firestopping, Sealants, HM Doors, Frames and Hardware, Kalwall Panel System, Glass, Glazing and Louvers, Drywall-Cement Plaster-GWB, Tiling, Acoustical Ceilings, Flooring Prep and Moisture Control, Carpet-Resilient Flooring, Vinyl Tack board and FRP, Painting, Specialties-Markerboards-Signage-Toilet Accessories, Fire Sprinkler, Plumbing, HVAC, Electrical, Communications-Assistive Listening, Fire Alarm, Landscape-Irrigation-Planting, Acceptance Testing -ATTCP Certified.
New Library/Multi-Media Building at Huron Elementary School
Not Available
Coalinga-Huron Elementary School District
36131 N. Street, Huron, CA, 93234
08-12-2026 at 02:00 PM
Rob Harris
559-575-3000
559-775-5194
1840 Shaw Ave. Ste. 105-08, Clovis, CA, 93611
PROJECT DETAILS:
All qualified bidders will receive consideration without regard to race, color, religion, sex or national origin. Bid documents may be examined and obtained at the Architect's office, 4320 West Mineral King Avenue, Visalia, CA 93291, 559-627-0530, Monday through Thursday between 8 am and 5 pm and Friday between 8 am and 12 pm or Dodge Data & Analytics, ConstructConnect, Tulare-Kings County Builders Exchange (Visalia) , the Central California Builders Exchange (Fresno), Kern County's Builders Exchange (Bakersfield), Builders Exchange of Stockton. They can also be reviewed at our office located, 2743 E. Shaw Ave. Ste.103 Fresno, CA 93710, by appointment only. Harris Development Corp. dba HBC Enterprises is requesting reasonable time prior to the bid dated, in order to fully evaluate quote. Subcontractors must possess a valid California Contractor's license, DIR Registration Number, and current insurance. Subcontractor's will be required to sign a standard subcontract agreement. This is a prevailing wage project and DBE project. Please contact our office if you are interested in this project. HBC will work cooperatively with all qualified firms seeking to work on this project. All quotes must include a DIR number. Harris Development Corp. dba HBC Enterprises can break each item into smaller more feasible parts to manage if needed.