is seeking certified and qualified MBE, SBE and WBE subcontractors and/or suppliers to provide Piping, Fittings, HDPE, Concrete, Rock Riprap, Grading, Excavation
Stockdale North Recharge Facility Recovery Lines & Structures Project
GBJPA 2026-02
Groundwater Banking Joint Powers Authority
Intersection of State Route 43 - Enos Lane and Stockdale Highway, Bakersfield, CA, 93314
08-26-2026 at 02:00 PM
Cherie Layton
6618588223
661-846-6999
6906 Downing Avenue, Bakersfield, CA, 93308
PROJECT DETAILS:
We are an Equal Opportunity Employer. If you are planning to bid this project, we encourage your participation and welcome your bid. Subcontractors will be required to enter into our standard contract. No Modifications to the contract are permitted. Description of the work is as follows, Furnish and Install approx 1570 LF of 15" PIP PVC pipe from Well SN1 to existing Rosedale 1 Channel including all fittings, appurtenances, connections, and canal discharge piping, 2355 LF of 15" PIP PVC pipe from Well SN2 to existing Rosedale 1 Channel including all fittings, appurtenances, connections, and canal discharge piping. Install the Distrcit furnished precast concrete turnout structure and wing walls. Furnish and install approx 40LF of 48" Triple Wall HDPE, concrete cutoff wall, slurry backfill, geotextile fabric, rock riprap, and weir boards. Furnish and install reinforced concrete spillway to Rosedale 1 Channel in the northwest corner of Stockdale North Recharge Facility. Please send your Inquires and Quotes to Cherie Layton at Cherie_Layton@ufsc.us.