is seeking certified and qualified DVBE subcontractors and/or suppliers to provide Demolition, Cast-in-Place Concrete, Concrete Forming and Accessories, Maintenance of Concrete Concrete Reinforcing, Structural Steel Framing, Post-Installed Concrete Anchors, Metal Fabrications, Pipe and Tube Railings, Perforated Metal, Joint Sealants, High-Performance Coatings, Signage, Pre-Engineered Fabric Shade Structure, ELECTRICAL, EARTHWORK, Landscaping, Operation and Maintenance of Planting, Irrigation System, Concrete Paving, Chain Link Fences and Gates, Ornamental Metal Fences and Gates
Valley View High School Plaza Renovation
BID NO. 26-27-03
Moreno Valley Unified School District
13135 Nason St, Moreno Valley, CA, 92555
07-31-2026 at 02:00 PM
Eddie Howard
(714)745-7930
Not Available
1800 E McFadden Ave, Santa Ana, CA, 92705
PROJECT DETAILS:
Summary of work: The scope of work to be performed consists of the following divisions, Surveying, Demolition, Concrete, Rebar, Structural Steel Framing, Metal fabrications, Railings, Painting, Signage, Shade Structures, Electrical, Earthwork, Landscaping & Irrigation, Site Concrete, Fences & Gates, Final Cleaning.
Project Labor Specifics: Prevailing Wage, CARB, NO PLA, NO CWA, NO CBA
Insurance Requirements: Please see Part 6 page 108
Liquidated Damages: $2000
Construction Time: 295 consecutive cal. days
RFI Deadline: July 24 at 4:00 pm
Estimated Start: September 9th 2026
Estimated Finish: June 30th 2027
The prequalification requirement applies to each MEP contractor with any of the following licenses: C-4 (boiler, hot water, and steam fitting); C-7 (low-voltage systems); C-10 (electrical); C-16 (fire protection); C-20 (HVAC); C-34 (pipeline); C-36 (plumbing); C-38 (refrigeration); C-42 (sanitation systems); C-43 (sheet metal); or C-46 (solar). Each contractor that desires to bid on the Project should ensure that its potential MEP subcontractors have been prequalified by the District. The terms and conditions for prequalification are set forth in the prequalification questionnaire and instructions available for download from the District’s website.
The California Air Resources Board (“CARB”) In-Use Off-Road Diesel-Fueled Fleets Regulation set forth at
Title 13 of the California Code of Regulations, Section 2449 et seq. (“CARB Regulation”), establishes
requirements applicable to public projects. Such requirements must be satisfied prior to entering into
(or renewing) a contract for a public project, if any one or more vehicles subject to the CARB Regulation
are used on the project.
The KYA Group may require all subcontractors bidding on projects to provide payment and performance bonds in the amount of 100% of the subcontract amount. KYA will assist with the bond premium up to 1.5% of the original contract amount for the duration of the project. KYA may waive the bond requirement at its sole discretion. The payment and performance bonds must be issued by an admitted surety within ten (10) business days of the receipt of the subcontract Agreement from KYA. KYA shall be named the oblige and shall guarantee prompt and faithful performance of the subcontract scope of work and the payment of all claims for labor and material furnished or used in and about the work to be done and performed under the subcontract agreement. When so requested, failure by the subcontractor to provide the requested 100% payment and performance bonds within the time allowed may be reason for KYA to request substitution of the subcontractor in accordance with section 4107 0f the Public Contracting Code.
The KYA Group, listing of a subcontractor is not an acceptance of any or all of that Subcontractor’s conditions, qualifications, exclusions or exceptions included in the subcontractor’s bid proposal. The subcontractor agrees that its bid will remain valid for the same period of time that KYA bid must remain valid with the owner, as specified in the project’s specifications. Each listed Subcontractor must execute KYA’s standard subcontract agreement if KYA is awarded the project. Subcontractor must submit pay applications-including invoices, sworn statements, and conditional and/or unconditional lien waivers.
If the project is subject to a project Labor Agreement or Project Stabilization Agreement, subcontractor, by submitting a bid proposal, acknowledges the requirements of such agreements and further agrees to adhere to all of the requirements as provided in the bid documents General conditions and supplemental Conditions.
As of June 20, 2014 the State of California passed a law that requires all contractors bidding or working on ANY public works project to register with the State Department of Industrial Relations (DIR) and pay an annual registration fee. Starting March 1, 2015, any contractor bidding on a public works project must be registered with the DIR in order for their bid to be deemed responsive. As of April 1, 2015, all contractors awarded a public works contract must be registered with the DIR. Subcontractors providing bids or work without DIR registration will result in a DIR penalty.
Special Notice to All Subcontractors
Non-Price terms included in competitive bids at bid time, may cause your bid to be as non-responsive. KYA Group will not accept any provisions or qualifications in subcontractor bids that are not in the bid documents. By submitting a bid on this project, Subcontractor acknowledges that KYA group is relying on the price terms of your quote and that any non-price terms contrary to or in addition to the provisions in the bid documents are null and void.